Flows
Cut-over from Excel
Tom loads the trackers, merges duplicates, runs the parallel run with its daily reconciliation, and cuts over; the trackers become read-only.
- Actors
- Tom Ashworth, Admin, who maps, dry-runs, loads, merges and records the cut-over; Dana Whitfield, Partnerships, who explains a difference; Rhys Calloway, Partner / MD, who agrees the date; Jamie Morgan, Land, for the Land Sites logs
- Starts at
- Settings › Data import, no import started
- Ends at
- Every tracker cut over, the files recorded as locked, loads refused; the team works from the Sites only
-
1 Open the import
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
No import has started
Each tracker is dry-run first, then loaded as a batch. Nothing changes in the CRM before a load, and a load sends no notifications.
Trackers from the agreed sources
16 files · the order of loading is agreed with Valere- Regional Sales Master – South & West 2026.xlsxNot loaded
- Regional Sales Master – Central 2026.xlsxNot loaded
- Regional Sales Master – London & East 2026.xlsxNot loaded
- Offers log 2026.xlsxNot loaded
- Construction Master.xlsxNot loaded
- Land Sites log – South & West.xlsxLand loads it into the private Land logLand only
- Deal Master.xlsxNot loaded
- Deal Master Tracker.xlsxNot loaded
- Appraisal tracker 2026.xlsxNot loaded
- Contractors Master 2026.xlsxNot loaded
- Contractor feedback master.xlsxNot loaded
- Weekly Regional Review – South & West.xlsxNot loaded
- Valere RP Master.xlsxNot loaded
- Housebuilder matrix.xlsxNot loaded
- Historic CSAs (SharePoint folder)Not loaded
- Sites (SharePoint library)Not loaded
Tom Ashworth clicks Settings 1 in the sidebar, then Data import 2. No import has started: the trackers from the agreed sources are listed, none loaded yet (IMP-C24).
-
2 Check the import map
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Map forEvery change is in the audit log; batches already loaded keep the map they were loaded withColumns to fields
Sample rows · agreed in the first workshops (S-03 §10-5)Tracker column CRM field Rule Tab name Site name One tab is one Site Site Code Site Code Key · kept as it is Date Instructed Date Instructed Key Date Out for Bids Date Out for Bids Key Local authority Region From the Regions 2026 list Stage Stage Translated Status Status Translated Keys
S-03 CORE-12Site CodeDate InstructedDate Out for BidsValue translations
A value with no translation is set aside, never guessedTracker value CRM value List Under offer Under Offer Stage Legals/contracts out Legals Stage On hold On Hold Lead status South South & West Region · kept as an alias Midlands Central Region · kept as an alias East & London London & East Region · kept as an alias Loading role
Admin Any other role is refused; the Land Sites logs are loaded by LandTom opens Import map 1 and picks the Regional Sales Master of South & West 2: the keys Site Code, Date Instructed and Date Out for Bids, the columns-to-fields map, the value translations with the old region names kept as aliases (A-062), and the loading role, Admin (IMP-C01).
-
3 Dry run
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Dry run
Changes nothing in the CRMFile- Regional Sales Master – South & West 2026.xlsxChosen from SharePoint
MapDry-run report
Regional Sales Master – South & West 2026.xlsx · Mon 12 Oct 2026, 10:15Nothing has changed in the CRMThis is what a load would do. Run it again as often as needed before loading.Rows read38Would load33Would update0Would merge2Set aside3Aliases to create4Tab set aside Reason Thatcham Road No Site Code Kingsmead Ph2 Site Code conflict: SW-024 is also on tab “Kingsmead” Bucklebury Lane Local authority not on the Regions 2026 list While the file is read
Reading Regional Sales Master – South & West 2026.xlsx
Rows are validated and matched; nothing changes in the CRM.
Tom clicks Dry run 1, chooses the file 2, keeps the map 3 and clicks Run 4. A loader shows while the file is read; then the report: 38 rows read, 33 would load, 2 would merge, 3 set aside with their reasons, 4 aliases. Nothing has changed in the CRM (IMP-C02).
-
4 Load the batch
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Regional Sales Master – South & West 2026.xlsxloadedLoaded Mon 12 Oct 2026, 10:40 · Tom AshworthRows read38Loaded33Updated0Merged2Set aside3Aliases created4Sites from this batch
33 Sites · 4 of them shownSite Code Site Source tab Clocks from SW-027 Orchard Lane, Wokingham Orchard Lane Cut-over date SW-024 Kingsmead, Basingstoke Kingsmead Cut-over date SW-019 Mill Pond, Newbury Mill Pond Cut-over date SW-031 Hatch Farm, Sindlesham Hatch Farm Cut-over date Orchard Lane, Wokingham
Site › Overview- Site Code
- SW-027 kept from the tracker
- Source
- Regional Sales Master – South & West 2026.xlsx › tab Orchard Lane
- Stage
- Instructed as the tracker gives it
- Clocks, last progress
- From the cut-over date, unless the tracker gives a later event
No alert, stall badge or handoff firedA load sends no notifications (RK-16).Before: the confirmation
Dry-run reportLoad as a batch?
33 rows load, 2 merge, 3 are set aside and 4 aliases are created. The tracker file is never changed.
Tom clicks Load as a batch 1 and confirms 2. The batch is loaded with its counts; the Sites of South & West keep their Site Codes (Orchard Lane SW-027, Kingsmead SW-024, …), and a Site’s Overview names its source tracker and tab, its clocks starting from the cut-over date. No alert, stall badge or handoff fires (IMP-C03, IMP-C05, RK-16).
-
5 Load the RP Master — system: duplicates
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Valere RP Master.xlsxloadedLoaded Tue 13 Oct 2026, 09:55 · Tom AshworthRows read4,250Loaded3,994Updated0Merged236Held3Set aside17Aliases created259Duplicates to settle
3 uncertain matches held for a person- Calder Valley HomesCalder Valley Housing Associationheld
- 2 more held matches
What the load did
- 236 confident matches merged into one master Account each
- 3 uncertain matches held, nothing merged
- 259 aliases kept for the names merged away
Tom dry-runs and loads the Valere RP Master the same way. The system merges 236 confident matches and holds 3 uncertain ones; the batch counts them, and the held Calder Valley Homes match is listed under Duplicates to settle 1 (IMP-C13, IMP-C18).
-
6 Settle a duplicate
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Held match from the Valere RP MasterheldSame contact and work email under two namesCalder Valley Homes
Row of Valere RP Master.xlsx- Buyer type
- RP
- Contact
- Sarah Lomax · Head of Land, Central & East
- Work email
- sarah.lomax@caldervalley.example
Calder Valley Housing Association
Row of Valere RP Master.xlsx- Buyer type
- RP
- Contact
- Sarah Lomax · Head of Land, Central & East
- Work email
- sarah.lomax@caldervalley.example
Merge into one Account
Pick the master. The other name stays as an alias, and every Site, Contact, activity and involvement moves to the master.
After: one master Account
Calder Valley HomesRP- Also known as
- Calder Valley Housing Association
- Sites
- Church Farm, Heron Fields, Orchard Lane
Merged by Tom Ashworth · Tue 13 Oct 2026, 11:10 · in the audit log
Later loads and emails that use the alias match this Account.
Tom compares the two records side by side, clicks Merge 1 and picks Calder Valley Homes as the master 2. One Account remains, Calder Valley Housing Association kept as its alias and every link moved to it; the merge is in the audit log, and later loads and emails that use the alias match the same Account (IMP-C19, IMP-C20).
-
7 Start the parallel run
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Parallel runSince Mon 19 Oct 2026 · the team works in the trackers and in the CRM; each tracker is reconciled dailyTrackers in the run
15 of 15 loaded- Regional Sales Master – South & West 2026.xlsxReconciled dailyloaded
- Regional Sales Master – Central 2026.xlsxReconciled dailyloaded
- Regional Sales Master – London & East 2026.xlsxReconciled dailyloaded
- Offers log 2026.xlsxReconciled dailyloaded
- Construction Master.xlsxReconciled dailyloaded
- Deal Master.xlsxReconciled dailyloaded
- Deal Master Tracker.xlsxReconciled dailyloaded
- Appraisal tracker 2026.xlsxReconciled dailyloaded
- Contractors Master 2026.xlsxReconciled dailyloaded
- Contractor feedback master.xlsxReconciled dailyloaded
- Weekly Regional Review – South & West.xlsxReconciled dailyloaded
- Valere RP Master.xlsxReconciled dailyloaded
- Housebuilder matrix.xlsxReconciled dailyloaded
- Historic CSAs (SharePoint folder)Reconciled dailyloaded
- Sites (SharePoint library)Reconciled dailyloaded
Before: the status view
Every tracker in scope is loaded: 15 of 15With every tracker in scope loaded, Tom clicks Start the parallel run 1. The status view shows the Parallel run band, begun Mon 19 Oct 2026, and each tracker with its batch, reconciled daily (IMP-C21).
-
8 System: the daily reconciliation
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Parallel runSince Mon 19 Oct 2026 · the CRM is compared with each live tracker once a dayReconciliation report
Per tracker · a batch with none open is reconciled- Regional Sales Master – London & East 2026.xlsx1 open differenceloaded
- Construction Master.xlsx1 open differenceloaded
- Regional Sales Master – South & West 2026.xlsx1 open differenceloaded
- Valere RP Master.xlsxNo open differencesreconciled
- Deal Master.xlsxNo open differencesreconciled
- 10 more trackers reconciled
Open differences
Listed until explained or fixedSite Field Tracker CRM Heron Fields LE-022 Units 44 46 Lea Bridge Works LE-019 Date Out for Bids
Unchanged since yesterdayMon 19 Oct 2026 Wed 21 Oct 2026 Orchard Lane SW-027 Stage Instructed Acceptable Offer Each day the system compares the CRM with each live tracker and lists every difference by Site and field, the tracker value beside the CRM value, “unchanged since yesterday” where so; a batch with none open moves to reconciled (IMP-C22).
-
9 Explain or fix a difference
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Dana Whitfield, Partnerships PM
Parallel runSince Mon 19 Oct 2026 · the CRM is compared with each live tracker once a dayReconciliation report
Per tracker · a batch with none open is reconciled- Regional Sales Master – London & East 2026.xlsx1 open differenceloaded
- Construction Master.xlsx1 open differenceloaded
- Regional Sales Master – South & West 2026.xlsx1 open differenceloaded
- Valere RP Master.xlsxNo open differencesreconciled
- Deal Master.xlsxNo open differencesreconciled
- 10 more trackers reconciled
Open differences
Listed until explained or fixedSite Field Tracker CRM Heron Fields LE-022 Units 44 46 Lea Bridge Works LE-019 Date Out for Bids
Unchanged since yesterdayMon 19 Oct 2026 Wed 21 Oct 2026 Orchard Lane SW-027 Stage Instructed Acceptable Offer After: the difference closed
Heron Fields · UnitsExplainedThe revised layout approved on 21 Oct added 2 units; the tracker still shows the earlier scheme.
DWDana Whitfield · Wed 4 Nov 2026 · audited
A new difference later returns the batch to loaded (D-034).
Dana Whitfield opens the Heron Fields difference 1 (Partnerships acts on Sites of all regions), chooses Explain 2, writes why the tracker row is wrong 3 and closes it 4. The difference is closed with Dana’s name, the date and the reason, audited; a new difference later would return the batch to loaded (IMP-C23, D-034).
-
10 Run the acceptance checks
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
All three checks passed
Day 16 of the parallel run · S-03 §9
Instructed Sites present
Passed5 of 5 instructed Sites against the trackers · 100%
Passes at 100%: every Site with a Date Instructed in the Regional Sales Masters
Fee totals against the Deal Master
PassedLive £1,426,000 · Deal Master £1,426,000
Instructed Site Live fee Deal Master Difference Church Farm CE-014 £262,000 £262,000 £0 Heron Fields LE-022 £310,000 £310,000 £0 Lea Bridge Works LE-019 £380,000 £380,000 £0 Orchard Lane SW-027 £298,000 £298,000 £0 Kingsmead SW-024 £176,000 £176,000 £0 Passes to the pound. Which Deal Master fee columns count is confirmed with Valere [?Q-021]
Top 100 RPs — no duplicate Accounts
Passed0 duplicate pairs
The measure behind the top 100 RPs is confirmed with Valere [?Q-021]
Tom runs the three checks of S-03 §9: Instructed Sites present 1, Fee totals against the Deal Master 2, Top 100 RPs — no duplicate Accounts 3. Each passes: 5 of 5 instructed Sites, £1,426,000 live against the Deal Master’s £1,426,000 to the pound, no duplicate pair (IMP-C27, IMP-C28, IMP-C29). The measure and the fee columns are confirmed with Valere [?Q-021].
-
11 Agree and set the cut-over date
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Cut-over date
An audited settingEvery batch reconciled · 0 open differencesSeen by Rhys Calloway, Partner / MD, the named decision-makerCut-over dateAgreed by Rhys Calloway on Mon 23 Nov 2026Cut-over date recordedTom Ashworth · Mon 23 Nov 2026 · in the audit log. From the date the trackers are read-only.Files Valere must lock
The product never writes to them; record each lock- Regional Sales Master – South & West 2026.xlsx
- Regional Sales Master – Central 2026.xlsx
- Regional Sales Master – London & East 2026.xlsx
- Offers log 2026.xlsx
- Construction Master.xlsx
- Deal Master.xlsx
- Deal Master Tracker.xlsx
- Appraisal tracker 2026.xlsx
- Contractors Master 2026.xlsx
- Contractor feedback master.xlsx
- Weekly Regional Review – South & West.xlsx
- Valere RP Master.xlsx
- Housebuilder matrix.xlsx
- Historic CSAs (SharePoint folder)
- Sites (SharePoint library)
Rhys Calloway sees every batch reconciled and, as the named decision-maker, agrees a date on Mon 23 Nov 2026; Tom enters it in Cut-over date 1 and saves 2. The date is an audited setting; the files Valere must lock are listed, and Tom clicks Record lock 3 on each as Valere locks it (IMP-C25, IMP-C24, IMP-C26).
-
12 System: cut-over
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Cut overOn Mon 30 Nov 2026 every batch moved to cut over. The product refuses further loads; the team works from the Sites only.Trackers
Every file recorded as locked- Regional Sales Master – South & West 2026.xlsxLocked Mon 30 Nov 2026cut over
- Regional Sales Master – Central 2026.xlsxLocked Mon 30 Nov 2026cut over
- Regional Sales Master – London & East 2026.xlsxLocked Mon 30 Nov 2026cut over
- Offers log 2026.xlsxLocked Mon 30 Nov 2026cut over
- Construction Master.xlsxLocked Mon 30 Nov 2026cut over
- Deal Master.xlsxLocked Mon 30 Nov 2026cut over
- Deal Master Tracker.xlsxLocked Mon 30 Nov 2026cut over
- Appraisal tracker 2026.xlsxLocked Mon 30 Nov 2026cut over
- Contractors Master 2026.xlsxLocked Mon 30 Nov 2026cut over
- Contractor feedback master.xlsxLocked Mon 30 Nov 2026cut over
- Weekly Regional Review – South & West.xlsxLocked Mon 30 Nov 2026cut over
- Valere RP Master.xlsxLocked Mon 30 Nov 2026cut over
- Housebuilder matrix.xlsxLocked Mon 30 Nov 2026cut over
- Historic CSAs (SharePoint folder)Locked Mon 30 Nov 2026cut over
- Sites (SharePoint library)Locked Mon 30 Nov 2026cut over
On Mon 30 Nov 2026 every batch moves to cut over and the product refuses further loads of those trackers: the status view shows each with its lock date, and the Load button is replaced by “Read-only since Mon 30 Nov 2026”. The team’s Sites, actions and views run from the CRM only (IMP-C26, A-062).
-
13 Alternative: the file does not match the map
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Dry run
Changes nothing in the CRMFile- Regional Sales Master – South & West 2026.xlsxChosen from SharePoint
MapDry-run report
The dry run stopped
The file does not match the map. Missing from the file: the column Date Out for Bids, a key of the map.
Nothing was read; nothing has changed in the CRM.
Alternative: a column of the map is missing from the file, so the dry run stops, naming what is missing; nothing is read (IMP-C02). Tom checks the Import map 1 or chooses another file 2.
-
14 Alternative: an import row failing validation
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Regional Sales Master – South & West 2026.xlsxloaded3 rows set aside · this batch keeps its countRows set aside
Correct the map or settle the row; never guessedTab set aside Reason To settle Thatcham Road No Site Code Stays aside: a code is never invented Kingsmead Ph2 Site Code conflict: SW-024 is also on tab “Kingsmead” Bucklebury Lane Local authority not on the Regions 2026 list Makes a new batchAlternative: a tab with no Site Code, a local authority not on the Regions 2026 list, a value with no translation — each row is set aside with its reason, never guessed. Tom names the Region 1 (or corrects the map) and clicks Re-load the set-aside rows 2, which makes a new batch; the first batch keeps its count (IMP-C01, IMP-C04, IMP-C05).
-
15 Alternative: a Site Code conflict
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Site Code conflict · SW-024Site Codes are never reusedTab Kingsmead
loaded- Site Code
- SW-024
- Source
- Regional Sales Master – South & West 2026.xlsx
- Now
- Loaded as Kingsmead, Basingstoke
Tab Kingsmead Ph2
Set aside- Site Code
- SW-024
- Source
- Regional Sales Master – South & West 2026.xlsx
- Now
- Set aside as a conflict
Settle it
Alternative: SW-024 appears on two tabs, so the row is set aside as a conflict. Tom settles it either as the same Site 1 or with a new code, SW-024 kept as an alias 2 (IMP-C02, IMP-C19).
-
16 Alternative: a load stops part-way
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Regional Sales Master – Central 2026.xlsxfailedNever loaded: the load stopped part-wayThe load stopped before every row was writtenThe batch is failed, never loaded. The rows it wrote are listed below; re-run the batch.Rows written before the stop
2 rowsSite Code Site Source tab CE-014 Church Farm, Rugby Church Farm CE-009 Mill Croft, Banbury Mill Croft Alternative: the load stops part-way, so the batch is failed, never loaded; the rows written are listed and Tom clicks Re-run 1 (IMP-C03, D-034).
-
17 Alternative: withdraw a batch
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Offers log 2026.xlsxloadedLoaded by mistake: the wrong trackerWithdraw this batch?
What this batch alone created is removed. Earlier batches and the tracker file are untouched.
ReasonThe withdrawal waits: 1 record was edited since the loadThe offer of Calder Valley Homes on Heron Fields, Colchester (LE-022). Settle it, then withdraw.Alternative: a wrong tracker was loaded. Tom clicks Withdraw 1 and gives a reason 2; what the batch alone created would be removed, but a record was edited since, so it is listed and the withdrawal waits (IMP-C30).
-
18 Alternative: a merge asked by a non-Admin
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Dana Whitfield, Partnerships PM
Held match from the Valere RP MasterheldSame contact and work email under two namesCalder Valley Homes
Row of Valere RP Master.xlsx- Buyer type
- RP
- Contact
- Sarah Lomax · Head of Land, Central & East
- Work email
- sarah.lomax@caldervalley.example
Calder Valley Housing Association
Row of Valere RP Master.xlsx- Buyer type
- RP
- Contact
- Sarah Lomax · Head of Land, Central & East
- Work email
- sarah.lomax@caldervalley.example
A merge is an Admin tool: your request is queued for Tom AshworthAlternative: Dana Whitfield settles the RP duplicate. Dana can only Keep apart 1; Ask for a merge 2 queues it for Tom Ashworth (IMP-C19, A-035).
-
19 Alternative: a reconciliation mismatch on fees
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
1 of 3 checks failedThe cut-over waits until the fee difference is explained or fixed.Fee totals against the Deal Master
FailedLive £1,426,000 · Deal Master £1,416,000
Instructed Site Live fee Deal Master Difference Church Farm CE-014 £262,000 £262,000 £0 Heron Fields LE-022 £310,000 £300,000 £10,000 Lea Bridge Works LE-019 £380,000 £380,000 £0 Orchard Lane SW-027 £298,000 £298,000 £0 Kingsmead SW-024 £176,000 £176,000 £0 Heron Fields · Agency fee: £310,000 live, £300,000 in the Deal MasterEntered into the reconciliation list; Deal Master.xlsx stays loaded until the difference is explained or fixed.Passes to the pound. Which Deal Master fee columns count is confirmed with Valere [?Q-021]
Instructed Sites present
Passed5 of 5 instructed Sites against the trackers · 100%
Passes at 100%: every Site with a Date Instructed in the Regional Sales Masters
Top 100 RPs — no duplicate Accounts
Passed0 duplicate pairs
The measure behind the top 100 RPs is confirmed with Valere [?Q-021]
Alternative: Tom runs the fee check 1 and it fails: £1,426,000 live against £1,416,000 in the Deal Master. The difference is listed by Site and fee stream (Heron Fields, Agency fee) and enters the reconciliation list; the batch stays loaded until it is explained or fixed (IMP-C28, IMP-C22).
-
20 Alternative: cut-over with differences still open
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Rhys Calloway, Partner / MD
Cut-over date
An audited setting2 differences still open on Mon 30 Nov 2026Lea Bridge Works · Date Out for Bids, and Orchard Lane · Stage. The date stands only as a logged exception a Partner / MD confirms with a reason.Cut-over dateAgreed by Rhys Calloway on Mon 23 Nov 2026Files Valere must lock
The product never writes to them; record each lock- Regional Sales Master – South & West 2026.xlsxLock not recorded
- Regional Sales Master – Central 2026.xlsxLock not recorded
- Regional Sales Master – London & East 2026.xlsxLock not recorded
- Offers log 2026.xlsxLock not recorded
- Construction Master.xlsxLock not recorded
- Deal Master.xlsxLock not recorded
- Deal Master Tracker.xlsxLock not recorded
- Appraisal tracker 2026.xlsxLock not recorded
- Contractors Master 2026.xlsxLock not recorded
- Contractor feedback master.xlsxLock not recorded
- Weekly Regional Review – South & West.xlsxLock not recorded
- Valere RP Master.xlsxLock not recorded
- Housebuilder matrix.xlsxLock not recorded
- Historic CSAs (SharePoint folder)Lock not recorded
- Sites (SharePoint library)Lock not recorded
Cut over with differences open?
The date stands as a logged exception. The open differences become Next Actions on their Sites for the owner of the function, or an admin list where no Site applies.
- Lea Bridge Works, Walthamstow · Date Out for Bids → a Next Action on the Site
- Orchard Lane, Wokingham · Stage → a Next Action on the Site
ReasonAlternative: two differences are still open on the date, so a warning shows. The date stands only as a logged exception: Rhys Calloway writes the reason 1 and confirms 2; the open differences become Next Actions on their Sites for the owner of the function, or an admin list where no Site applies (IMP-C25, A-684, D-033).
-
21 Alternative: a tracker changed after cut-over
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin
Load refused: Construction Master.xlsx is read-onlyLoads of this tracker stopped on the cut-over date, Mon 30 Nov 2026. One post-cut-over load is allowed, as a logged exception a Partner / MD confirms with the reason; a final reconciliation follows.Trackers
1 file flagged in the status view and the report- Regional Sales Master – South & West 2026.xlsxLocked Mon 30 Nov 2026cut over
- Regional Sales Master – Central 2026.xlsxLocked Mon 30 Nov 2026cut over
- Regional Sales Master – London & East 2026.xlsxLocked Mon 30 Nov 2026cut over
- Offers log 2026.xlsxLocked Mon 30 Nov 2026cut over
- Construction Master.xlsxChanged after the cut-over date, Mon 30 Nov 2026Changed
- Deal Master.xlsxLocked Mon 30 Nov 2026cut over
- Deal Master Tracker.xlsxLocked Mon 30 Nov 2026cut over
- Appraisal tracker 2026.xlsxLocked Mon 30 Nov 2026cut over
- Contractors Master 2026.xlsxLocked Mon 30 Nov 2026cut over
- Contractor feedback master.xlsxLocked Mon 30 Nov 2026cut over
- Weekly Regional Review – South & West.xlsxLocked Mon 30 Nov 2026cut over
- Valere RP Master.xlsxLocked Mon 30 Nov 2026cut over
- Housebuilder matrix.xlsxLocked Mon 30 Nov 2026cut over
- Historic CSAs (SharePoint folder)Locked Mon 30 Nov 2026cut over
- Sites (SharePoint library)Locked Mon 30 Nov 2026cut over
Alternative: Construction Master.xlsx changed after the cut-over date. It is flagged in the status view and the report; a load attempt is refused with the cut-over date shown. Only one post-cut-over load is possible 1, as a logged exception a Partner / MD confirms, followed by a final reconciliation (IMP-C03, IMP-C22, IMP-C26).
-
22 Alternative: the Land Sites logs
Updated 12m agoJMCHRCData import
Trackers, batches, the parallel run and the cut-over · Jamie Morgan, Land
Private Land logIts batches, duplicates and reconciliation are seen by Land and Partners / MD only; the Admin’s status view has no row for it.Land Sites log – South & West.xlsx
- Loaded by
- Jamie Morgan, Land
- Loads into
- The private Land log, under Leads
- Seen by
- JMJamie MorganSBSophie BrennanRCRhys CallowayESEleanor Shaw
Tom Ashworth (Admin) sees no batch, match or difference of this log
Alternative: Jamie Morgan dry-runs 1 and loads 2 Land Sites log – South & West.xlsx into the private Land log. Its batches, duplicates and reconciliation are seen by Land and Partners / MD only; Tom’s status view shows no row for them (IMP-C08, D-028).