Flows/Cut-over from Excel

Flows

Cut-over from Excel

Tom loads the trackers, merges duplicates, runs the parallel run with its daily reconciliation, and cuts over; the trackers become read-only.

Actors
Tom Ashworth, Admin, who maps, dry-runs, loads, merges and records the cut-over; Dana Whitfield, Partnerships, who explains a difference; Rhys Calloway, Partner / MD, who agrees the date; Jamie Morgan, Land, for the Land Sites logs
Starts at
Settings › Data import, no import started
Ends at
Every tracker cut over, the files recorded as locked, loads refused; the team works from the Sites only
Step 1 of 22 This screen is not drawn yet
  1. 1 Open the import

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    No import has started

    Each tracker is dry-run first, then loaded as a batch. Nothing changes in the CRM before a load, and a load sends no notifications.

    Trackers from the agreed sources

    16 files · the order of loading is agreed with Valere
    • Regional Sales Master – South & West 2026.xlsx
      Not loaded
    • Regional Sales Master – Central 2026.xlsx
      Not loaded
    • Regional Sales Master – London & East 2026.xlsx
      Not loaded
    • Offers log 2026.xlsx
      Not loaded
    • Construction Master.xlsx
      Not loaded
    • Land Sites log – South & West.xlsxLand loads it into the private Land log
      Land only
    • Deal Master.xlsx
      Not loaded
    • Deal Master Tracker.xlsx
      Not loaded
    • Appraisal tracker 2026.xlsx
      Not loaded
    • Contractors Master 2026.xlsx
      Not loaded
    • Contractor feedback master.xlsx
      Not loaded
    • Weekly Regional Review – South & West.xlsx
      Not loaded
    • Valere RP Master.xlsx
      Not loaded
    • Housebuilder matrix.xlsx
      Not loaded
    • Historic CSAs (SharePoint folder)
      Not loaded
    • Sites (SharePoint library)
      Not loaded

    Tom Ashworth clicks Settings 1 in the sidebar, then Data import 2. No import has started: the trackers from the agreed sources are listed, none loaded yet (IMP-C24).

  2. 2 Check the import map

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Map for
    Every change is in the audit log; batches already loaded keep the map they were loaded with

    Columns to fields

    Sample rows · agreed in the first workshops (S-03 §10-5)
    Tracker columnCRM fieldRule
    Tab nameSite nameOne tab is one Site
    Site CodeSite CodeKey · kept as it is
    Date InstructedDate InstructedKey
    Date Out for BidsDate Out for BidsKey
    Local authorityRegionFrom the Regions 2026 list
    StageStageTranslated
    StatusStatusTranslated

    Keys

    S-03 CORE-12
    Site CodeDate InstructedDate Out for Bids

    Value translations

    A value with no translation is set aside, never guessed
    Tracker valueCRM valueList
    Under offerUnder OfferStage
    Legals/contracts outLegalsStage
    On holdOn HoldLead status
    SouthSouth & WestRegion · kept as an alias
    MidlandsCentralRegion · kept as an alias
    East & LondonLondon & EastRegion · kept as an alias

    Loading role

    Admin Any other role is refused; the Land Sites logs are loaded by Land

    Tom opens Import map 1 and picks the Regional Sales Master of South & West 2: the keys Site Code, Date Instructed and Date Out for Bids, the columns-to-fields map, the value translations with the old region names kept as aliases (A-062), and the loading role, Admin (IMP-C01).

  3. 3 Dry run

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Dry run

    Changes nothing in the CRM
    File
    • Regional Sales Master – South & West 2026.xlsxChosen from SharePoint
    Map

    Dry-run report

    Regional Sales Master – South & West 2026.xlsx · Mon 12 Oct 2026, 10:15
    Nothing has changed in the CRMThis is what a load would do. Run it again as often as needed before loading.
    Rows read38
    Would load33
    Would update0
    Would merge2
    Set aside3
    Aliases to create4
    Tab set asideReason
    Thatcham RoadNo Site Code
    Kingsmead Ph2Site Code conflict: SW-024 is also on tab “Kingsmead”
    Bucklebury LaneLocal authority not on the Regions 2026 list

    While the file is read

    Reading Regional Sales Master – South & West 2026.xlsx

    Rows are validated and matched; nothing changes in the CRM.

    Tom clicks Dry run 1, chooses the file 2, keeps the map 3 and clicks Run 4. A loader shows while the file is read; then the report: 38 rows read, 33 would load, 2 would merge, 3 set aside with their reasons, 4 aliases. Nothing has changed in the CRM (IMP-C02).

  4. 4 Load the batch

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Regional Sales Master – South & West 2026.xlsxloaded
    Loaded Mon 12 Oct 2026, 10:40 · Tom Ashworth
    Rows read38
    Loaded33
    Updated0
    Merged2
    Set aside3
    Aliases created4

    Sites from this batch

    33 Sites · 4 of them shown
    Site CodeSiteSource tabClocks from
    SW-027Orchard Lane, WokinghamOrchard LaneCut-over date
    SW-024Kingsmead, BasingstokeKingsmeadCut-over date
    SW-019Mill Pond, NewburyMill PondCut-over date
    SW-031Hatch Farm, SindleshamHatch FarmCut-over date

    Orchard Lane, Wokingham

    Site › Overview
    Site Code
    SW-027 kept from the tracker
    Source
    Regional Sales Master – South & West 2026.xlsx › tab Orchard Lane
    Stage
    Instructed as the tracker gives it
    Clocks, last progress
    From the cut-over date, unless the tracker gives a later event
    No alert, stall badge or handoff firedA load sends no notifications (RK-16).

    Before: the confirmation

    Dry-run report

    Load as a batch?

    33 rows load, 2 merge, 3 are set aside and 4 aliases are created. The tracker file is never changed.

    Tom clicks Load as a batch 1 and confirms 2. The batch is loaded with its counts; the Sites of South & West keep their Site Codes (Orchard Lane SW-027, Kingsmead SW-024, …), and a Site’s Overview names its source tracker and tab, its clocks starting from the cut-over date. No alert, stall badge or handoff fires (IMP-C03, IMP-C05, RK-16).

  5. 5 Load the RP Master — system: duplicates

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Valere RP Master.xlsxloaded
    Loaded Tue 13 Oct 2026, 09:55 · Tom Ashworth
    Rows read4,250
    Loaded3,994
    Updated0
    Merged236
    Held3
    Set aside17
    Aliases created259

    Duplicates to settle

    3 uncertain matches held for a person
    • Calder Valley HomesCalder Valley Housing Associationheld
    • 2 more held matches

    What the load did

    • 236 confident matches merged into one master Account each
    • 3 uncertain matches held, nothing merged
    • 259 aliases kept for the names merged away

    Tom dry-runs and loads the Valere RP Master the same way. The system merges 236 confident matches and holds 3 uncertain ones; the batch counts them, and the held Calder Valley Homes match is listed under Duplicates to settle 1 (IMP-C13, IMP-C18).

  6. 6 Settle a duplicate

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Held match from the Valere RP Masterheld
    Same contact and work email under two names

    Calder Valley Homes

    Row of Valere RP Master.xlsx
    Buyer type
    RP
    Contact
    Sarah Lomax · Head of Land, Central & East
    Work email
    sarah.lomax@caldervalley.example

    Calder Valley Housing Association

    Row of Valere RP Master.xlsx
    Buyer type
    RP
    Contact
    Sarah Lomax · Head of Land, Central & East
    Work email
    sarah.lomax@caldervalley.example

    Merge into one Account

    Pick the master. The other name stays as an alias, and every Site, Contact, activity and involvement moves to the master.

    After: one master Account

    Calder Valley HomesRP
    Also known as
    Calder Valley Housing Association
    Sites
    Church Farm, Heron Fields, Orchard Lane

    Merged by Tom Ashworth · Tue 13 Oct 2026, 11:10 · in the audit log

    Later loads and emails that use the alias match this Account.

    Tom compares the two records side by side, clicks Merge 1 and picks Calder Valley Homes as the master 2. One Account remains, Calder Valley Housing Association kept as its alias and every link moved to it; the merge is in the audit log, and later loads and emails that use the alias match the same Account (IMP-C19, IMP-C20).

  7. 7 Start the parallel run

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Parallel runSince Mon 19 Oct 2026 · the team works in the trackers and in the CRM; each tracker is reconciled daily

    Trackers in the run

    15 of 15 loaded
    • Regional Sales Master – South & West 2026.xlsxReconciled daily
      loaded
    • Regional Sales Master – Central 2026.xlsxReconciled daily
      loaded
    • Regional Sales Master – London & East 2026.xlsxReconciled daily
      loaded
    • Offers log 2026.xlsxReconciled daily
      loaded
    • Construction Master.xlsxReconciled daily
      loaded
    • Deal Master.xlsxReconciled daily
      loaded
    • Deal Master Tracker.xlsxReconciled daily
      loaded
    • Appraisal tracker 2026.xlsxReconciled daily
      loaded
    • Contractors Master 2026.xlsxReconciled daily
      loaded
    • Contractor feedback master.xlsxReconciled daily
      loaded
    • Weekly Regional Review – South & West.xlsxReconciled daily
      loaded
    • Valere RP Master.xlsxReconciled daily
      loaded
    • Housebuilder matrix.xlsxReconciled daily
      loaded
    • Historic CSAs (SharePoint folder)Reconciled daily
      loaded
    • Sites (SharePoint library)Reconciled daily
      loaded

    Before: the status view

    Every tracker in scope is loaded: 15 of 15

    With every tracker in scope loaded, Tom clicks Start the parallel run 1. The status view shows the Parallel run band, begun Mon 19 Oct 2026, and each tracker with its batch, reconciled daily (IMP-C21).

  8. 8 System: the daily reconciliation

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Parallel runSince Mon 19 Oct 2026 · the CRM is compared with each live tracker once a day

    Reconciliation report

    Per tracker · a batch with none open is reconciled
    • Regional Sales Master – London & East 2026.xlsx1 open difference
      loaded
    • Construction Master.xlsx1 open difference
      loaded
    • Regional Sales Master – South & West 2026.xlsx1 open difference
      loaded
    • Valere RP Master.xlsxNo open differences
      reconciled
    • Deal Master.xlsxNo open differences
      reconciled
    • 10 more trackers reconciled

    Open differences

    Listed until explained or fixed
    SiteFieldTrackerCRM
    Heron Fields LE-022Units4446
    Lea Bridge Works LE-019Date Out for Bids
    Unchanged since yesterday
    Mon 19 Oct 2026Wed 21 Oct 2026
    Orchard Lane SW-027StageInstructedAcceptable Offer

    Each day the system compares the CRM with each live tracker and lists every difference by Site and field, the tracker value beside the CRM value, “unchanged since yesterday” where so; a batch with none open moves to reconciled (IMP-C22).

  9. 9 Explain or fix a difference

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Dana Whitfield, Partnerships PM

    Parallel runSince Mon 19 Oct 2026 · the CRM is compared with each live tracker once a day

    Reconciliation report

    Per tracker · a batch with none open is reconciled
    • Regional Sales Master – London & East 2026.xlsx1 open difference
      loaded
    • Construction Master.xlsx1 open difference
      loaded
    • Regional Sales Master – South & West 2026.xlsx1 open difference
      loaded
    • Valere RP Master.xlsxNo open differences
      reconciled
    • Deal Master.xlsxNo open differences
      reconciled
    • 10 more trackers reconciled

    Open differences

    Listed until explained or fixed
    SiteFieldTrackerCRM
    Heron Fields LE-022Units4446
    Lea Bridge Works LE-019Date Out for Bids
    Unchanged since yesterday
    Mon 19 Oct 2026Wed 21 Oct 2026
    Orchard Lane SW-027StageInstructedAcceptable Offer

    After: the difference closed

    Heron Fields · UnitsExplained

    The revised layout approved on 21 Oct added 2 units; the tracker still shows the earlier scheme.

    DWDana Whitfield · Wed 4 Nov 2026 · audited

    A new difference later returns the batch to loaded (D-034).

    Dana Whitfield opens the Heron Fields difference 1 (Partnerships acts on Sites of all regions), chooses Explain 2, writes why the tracker row is wrong 3 and closes it 4. The difference is closed with Dana’s name, the date and the reason, audited; a new difference later would return the batch to loaded (IMP-C23, D-034).

  10. 10 Run the acceptance checks

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    All three checks passed

    Day 16 of the parallel run · S-03 §9

    Instructed Sites present

    Passed

    5 of 5 instructed Sites against the trackers · 100%

    Passes at 100%: every Site with a Date Instructed in the Regional Sales Masters

    Fee totals against the Deal Master

    Passed

    Live £1,426,000 · Deal Master £1,426,000

    Instructed SiteLive feeDeal MasterDifference
    Church Farm CE-014£262,000£262,000£0
    Heron Fields LE-022£310,000£310,000£0
    Lea Bridge Works LE-019£380,000£380,000£0
    Orchard Lane SW-027£298,000£298,000£0
    Kingsmead SW-024£176,000£176,000£0

    Passes to the pound. Which Deal Master fee columns count is confirmed with Valere [?Q-021]

    Top 100 RPs — no duplicate Accounts

    Passed

    0 duplicate pairs

    The measure behind the top 100 RPs is confirmed with Valere [?Q-021]

    Tom runs the three checks of S-03 §9: Instructed Sites present 1, Fee totals against the Deal Master 2, Top 100 RPs — no duplicate Accounts 3. Each passes: 5 of 5 instructed Sites, £1,426,000 live against the Deal Master’s £1,426,000 to the pound, no duplicate pair (IMP-C27, IMP-C28, IMP-C29). The measure and the fee columns are confirmed with Valere [?Q-021].

  11. 11 Agree and set the cut-over date

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Cut-over date

    An audited setting
    Every batch reconciled · 0 open differencesSeen by Rhys Calloway, Partner / MD, the named decision-maker
    Cut-over dateAgreed by Rhys Calloway on Mon 23 Nov 2026
    Cut-over date recordedTom Ashworth · Mon 23 Nov 2026 · in the audit log. From the date the trackers are read-only.

    Files Valere must lock

    The product never writes to them; record each lock
    • Regional Sales Master – South & West 2026.xlsx
    • Regional Sales Master – Central 2026.xlsx
    • Regional Sales Master – London & East 2026.xlsx
    • Offers log 2026.xlsx
    • Construction Master.xlsx
    • Deal Master.xlsx
    • Deal Master Tracker.xlsx
    • Appraisal tracker 2026.xlsx
    • Contractors Master 2026.xlsx
    • Contractor feedback master.xlsx
    • Weekly Regional Review – South & West.xlsx
    • Valere RP Master.xlsx
    • Housebuilder matrix.xlsx
    • Historic CSAs (SharePoint folder)
    • Sites (SharePoint library)

    Rhys Calloway sees every batch reconciled and, as the named decision-maker, agrees a date on Mon 23 Nov 2026; Tom enters it in Cut-over date 1 and saves 2. The date is an audited setting; the files Valere must lock are listed, and Tom clicks Record lock 3 on each as Valere locks it (IMP-C25, IMP-C24, IMP-C26).

  12. 12 System: cut-over

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Read-only since Mon 30 Nov 2026
    Cut overOn Mon 30 Nov 2026 every batch moved to cut over. The product refuses further loads; the team works from the Sites only.

    Trackers

    Every file recorded as locked
    • Regional Sales Master – South & West 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Regional Sales Master – Central 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Regional Sales Master – London & East 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Offers log 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Construction Master.xlsxLocked Mon 30 Nov 2026
      cut over
    • Deal Master.xlsxLocked Mon 30 Nov 2026
      cut over
    • Deal Master Tracker.xlsxLocked Mon 30 Nov 2026
      cut over
    • Appraisal tracker 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Contractors Master 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Contractor feedback master.xlsxLocked Mon 30 Nov 2026
      cut over
    • Weekly Regional Review – South & West.xlsxLocked Mon 30 Nov 2026
      cut over
    • Valere RP Master.xlsxLocked Mon 30 Nov 2026
      cut over
    • Housebuilder matrix.xlsxLocked Mon 30 Nov 2026
      cut over
    • Historic CSAs (SharePoint folder)Locked Mon 30 Nov 2026
      cut over
    • Sites (SharePoint library)Locked Mon 30 Nov 2026
      cut over

    On Mon 30 Nov 2026 every batch moves to cut over and the product refuses further loads of those trackers: the status view shows each with its lock date, and the Load button is replaced by “Read-only since Mon 30 Nov 2026”. The team’s Sites, actions and views run from the CRM only (IMP-C26, A-062).

  13. 13 Alternative: the file does not match the map

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Dry run

    Changes nothing in the CRM
    File
    • Regional Sales Master – South & West 2026.xlsxChosen from SharePoint
    Map

    Dry-run report

    The dry run stopped

    The file does not match the map. Missing from the file: the column Date Out for Bids, a key of the map.

    Nothing was read; nothing has changed in the CRM.

    Alternative: a column of the map is missing from the file, so the dry run stops, naming what is missing; nothing is read (IMP-C02). Tom checks the Import map 1 or chooses another file 2.

  14. 14 Alternative: an import row failing validation

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Regional Sales Master – South & West 2026.xlsxloaded
    3 rows set aside · this batch keeps its count

    Rows set aside

    Correct the map or settle the row; never guessed
    Tab set asideReasonTo settle
    Thatcham RoadNo Site CodeStays aside: a code is never invented
    Kingsmead Ph2Site Code conflict: SW-024 is also on tab “Kingsmead”
    Bucklebury LaneLocal authority not on the Regions 2026 list
    Makes a new batch

    Alternative: a tab with no Site Code, a local authority not on the Regions 2026 list, a value with no translation — each row is set aside with its reason, never guessed. Tom names the Region 1 (or corrects the map) and clicks Re-load the set-aside rows 2, which makes a new batch; the first batch keeps its count (IMP-C01, IMP-C04, IMP-C05).

  15. 15 Alternative: a Site Code conflict

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Site Code conflict · SW-024
    Site Codes are never reused

    Tab Kingsmead

    loaded
    Site Code
    SW-024
    Source
    Regional Sales Master – South & West 2026.xlsx
    Now
    Loaded as Kingsmead, Basingstoke

    Tab Kingsmead Ph2

    Set aside
    Site Code
    SW-024
    Source
    Regional Sales Master – South & West 2026.xlsx
    Now
    Set aside as a conflict

    Settle it

    Alternative: SW-024 appears on two tabs, so the row is set aside as a conflict. Tom settles it either as the same Site 1 or with a new code, SW-024 kept as an alias 2 (IMP-C02, IMP-C19).

  16. 16 Alternative: a load stops part-way

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Regional Sales Master – Central 2026.xlsxfailed
    Never loaded: the load stopped part-way
    The load stopped before every row was writtenThe batch is failed, never loaded. The rows it wrote are listed below; re-run the batch.

    Rows written before the stop

    2 rows
    Site CodeSiteSource tab
    CE-014Church Farm, RugbyChurch Farm
    CE-009Mill Croft, BanburyMill Croft

    Alternative: the load stops part-way, so the batch is failed, never loaded; the rows written are listed and Tom clicks Re-run 1 (IMP-C03, D-034).

  17. 17 Alternative: withdraw a batch

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Offers log 2026.xlsxloaded
    Loaded by mistake: the wrong tracker

    Withdraw this batch?

    What this batch alone created is removed. Earlier batches and the tracker file are untouched.

    Reason
    The withdrawal waits: 1 record was edited since the loadThe offer of Calder Valley Homes on Heron Fields, Colchester (LE-022). Settle it, then withdraw.

    Alternative: a wrong tracker was loaded. Tom clicks Withdraw 1 and gives a reason 2; what the batch alone created would be removed, but a record was edited since, so it is listed and the withdrawal waits (IMP-C30).

  18. 18 Alternative: a merge asked by a non-Admin

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Dana Whitfield, Partnerships PM

    Held match from the Valere RP Masterheld
    Same contact and work email under two names

    Calder Valley Homes

    Row of Valere RP Master.xlsx
    Buyer type
    RP
    Contact
    Sarah Lomax · Head of Land, Central & East
    Work email
    sarah.lomax@caldervalley.example

    Calder Valley Housing Association

    Row of Valere RP Master.xlsx
    Buyer type
    RP
    Contact
    Sarah Lomax · Head of Land, Central & East
    Work email
    sarah.lomax@caldervalley.example
    A merge is an Admin tool: your request is queued for Tom Ashworth

    Alternative: Dana Whitfield settles the RP duplicate. Dana can only Keep apart 1; Ask for a merge 2 queues it for Tom Ashworth (IMP-C19, A-035).

  19. 19 Alternative: a reconciliation mismatch on fees

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    1 of 3 checks failedThe cut-over waits until the fee difference is explained or fixed.

    Fee totals against the Deal Master

    Failed

    Live £1,426,000 · Deal Master £1,416,000

    Instructed SiteLive feeDeal MasterDifference
    Church Farm CE-014£262,000£262,000£0
    Heron Fields LE-022£310,000£300,000£10,000
    Lea Bridge Works LE-019£380,000£380,000£0
    Orchard Lane SW-027£298,000£298,000£0
    Kingsmead SW-024£176,000£176,000£0
    Heron Fields · Agency fee: £310,000 live, £300,000 in the Deal MasterEntered into the reconciliation list; Deal Master.xlsx stays loaded until the difference is explained or fixed.

    Passes to the pound. Which Deal Master fee columns count is confirmed with Valere [?Q-021]

    Instructed Sites present

    Passed

    5 of 5 instructed Sites against the trackers · 100%

    Passes at 100%: every Site with a Date Instructed in the Regional Sales Masters

    Top 100 RPs — no duplicate Accounts

    Passed

    0 duplicate pairs

    The measure behind the top 100 RPs is confirmed with Valere [?Q-021]

    Alternative: Tom runs the fee check 1 and it fails: £1,426,000 live against £1,416,000 in the Deal Master. The difference is listed by Site and fee stream (Heron Fields, Agency fee) and enters the reconciliation list; the batch stays loaded until it is explained or fixed (IMP-C28, IMP-C22).

  20. 20 Alternative: cut-over with differences still open

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Rhys Calloway, Partner / MD

    Cut-over date

    An audited setting
    2 differences still open on Mon 30 Nov 2026Lea Bridge Works · Date Out for Bids, and Orchard Lane · Stage. The date stands only as a logged exception a Partner / MD confirms with a reason.
    Cut-over dateAgreed by Rhys Calloway on Mon 23 Nov 2026

    Files Valere must lock

    The product never writes to them; record each lock
    • Regional Sales Master – South & West 2026.xlsx
      Lock not recorded
    • Regional Sales Master – Central 2026.xlsx
      Lock not recorded
    • Regional Sales Master – London & East 2026.xlsx
      Lock not recorded
    • Offers log 2026.xlsx
      Lock not recorded
    • Construction Master.xlsx
      Lock not recorded
    • Deal Master.xlsx
      Lock not recorded
    • Deal Master Tracker.xlsx
      Lock not recorded
    • Appraisal tracker 2026.xlsx
      Lock not recorded
    • Contractors Master 2026.xlsx
      Lock not recorded
    • Contractor feedback master.xlsx
      Lock not recorded
    • Weekly Regional Review – South & West.xlsx
      Lock not recorded
    • Valere RP Master.xlsx
      Lock not recorded
    • Housebuilder matrix.xlsx
      Lock not recorded
    • Historic CSAs (SharePoint folder)
      Lock not recorded
    • Sites (SharePoint library)
      Lock not recorded

    Cut over with differences open?

    The date stands as a logged exception. The open differences become Next Actions on their Sites for the owner of the function, or an admin list where no Site applies.

    • Lea Bridge Works, Walthamstow · Date Out for Bids → a Next Action on the Site
    • Orchard Lane, Wokingham · Stage → a Next Action on the Site
    Reason

    Alternative: two differences are still open on the date, so a warning shows. The date stands only as a logged exception: Rhys Calloway writes the reason 1 and confirms 2; the open differences become Next Actions on their Sites for the owner of the function, or an admin list where no Site applies (IMP-C25, A-684, D-033).

  21. 21 Alternative: a tracker changed after cut-over

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Tom Ashworth, Admin

    Load refused: Construction Master.xlsx is read-onlyLoads of this tracker stopped on the cut-over date, Mon 30 Nov 2026. One post-cut-over load is allowed, as a logged exception a Partner / MD confirms with the reason; a final reconciliation follows.

    Trackers

    1 file flagged in the status view and the report
    • Regional Sales Master – South & West 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Regional Sales Master – Central 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Regional Sales Master – London & East 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Offers log 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Construction Master.xlsxChanged after the cut-over date, Mon 30 Nov 2026
      Changed
    • Deal Master.xlsxLocked Mon 30 Nov 2026
      cut over
    • Deal Master Tracker.xlsxLocked Mon 30 Nov 2026
      cut over
    • Appraisal tracker 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Contractors Master 2026.xlsxLocked Mon 30 Nov 2026
      cut over
    • Contractor feedback master.xlsxLocked Mon 30 Nov 2026
      cut over
    • Weekly Regional Review – South & West.xlsxLocked Mon 30 Nov 2026
      cut over
    • Valere RP Master.xlsxLocked Mon 30 Nov 2026
      cut over
    • Housebuilder matrix.xlsxLocked Mon 30 Nov 2026
      cut over
    • Historic CSAs (SharePoint folder)Locked Mon 30 Nov 2026
      cut over
    • Sites (SharePoint library)Locked Mon 30 Nov 2026
      cut over

    Alternative: Construction Master.xlsx changed after the cut-over date. It is flagged in the status view and the report; a load attempt is refused with the cut-over date shown. Only one post-cut-over load is possible 1, as a logged exception a Partner / MD confirms, followed by a final reconciliation (IMP-C03, IMP-C22, IMP-C26).

  22. 22 Alternative: the Land Sites logs

    Updated 12m agoJMCHRC

    Data import

    Trackers, batches, the parallel run and the cut-over · Jamie Morgan, Land

    Private Land logIts batches, duplicates and reconciliation are seen by Land and Partners / MD only; the Admin’s status view has no row for it.

    Land Sites log – South & West.xlsx

    Loaded by
    Jamie Morgan, Land
    Loads into
    The private Land log, under Leads
    Seen by
    JMJamie MorganSBSophie BrennanRCRhys CallowayESEleanor Shaw

    Tom Ashworth (Admin) sees no batch, match or difference of this log

    Alternative: Jamie Morgan dry-runs 1 and loads 2 Land Sites log – South & West.xlsx into the private Land log. Its batches, duplicates and reconciliation are seen by Land and Partners / MD only; Tom’s status view shows no row for them (IMP-C08, D-028).