Flows/An email or a meeting becomes a record update
Flows
An email or a meeting becomes a record update
A solicitor’s email becomes a proposed date change Dana accepts; an enquiry becomes a Candidate lead; a Teams transcript becomes actions the chair approves.
Actors
Dana Whitfield, Partnerships PM, owner of Church Farm; Rhys Calloway, Partner / MD, organiser and chair of the recorded Morning Meeting. The system captures, files and proposes; nothing changes until a named person accepts.
Starts at
An email from Hadley & Finch LLP about Church Farm, Rugby (CE-014) in Dana’s Outlook, Fri 6 Nov 2026.
Ends at
The agreed exchange date accepted on Church Farm with the email linked; an inbound site offer waiting in the Review queue; the Morning Meeting of Mon 9 Nov 2026 approved by its chair, its actions and weekly entries written.
Step1of21This screen is not drawn yet
1An email arrives
Church Farm, Rugby (CE-014): exchange date agreed Alex Rowan, Hadley & Finch LLP <alex.rowan@hadleyfinch.example> → dana.whitfield@valere.example
Outlook · InboxFri 6 Nov 2026 · 15:20
AR
Alex Rowan · Hadley & Finch LLPalex.rowan@hadleyfinch.example
Dear Dana,
All parties have now agreed a target exchange date of 13 November 2026 for Church Farm. Completion stays at 4 December.
I attach the draft transfer for your file; the land contract draft follows separately.
Kind regards,
Alex Rowan, Associate, Hadley & Finch LLP
Draft transfer (TR1), Church Farm.pdfPDF
In Outlook, Dana Whitfield opens the email from Alex Rowan of Hadley & Finch LLP on Church Farm: the target exchange date is agreed for Fri 13 Nov 2026, completion stays Fri 4 Dec, the draft transfer is attached. Dana Whitfield does nothing in the CRM.
2System: the email is logged
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
GDV£13,420,000Approved appraisal
Land£3,640,000£130,000 per unit
Build£6,394,000+£74,000 since HoTs
Package£10,034,00074.8% of GDV
Fees£262,0002.6% of package
Stages
One record from Lead to Completed; each move is set by the event its module records
Construction Involved: Acceptable Build applies
Lead10 stages done
Instructed3 Aug
Acceptable Offer26 Aug
Acceptable Build14 Sep
Under Offer14 Sep
LegalsSince 5 Oct
ExchangedTarget 6 Nov
CompletedTarget 4 Dec
Activity
Logged from Outlook · nothing typed
Fri 6 Nov 2026
Email from Hadley & Finch LLP · Fri 6 NovEmail
Church Farm, Rugby (CE-014): exchange date agreed
On the Contact Alex Rowan and on Church Farm, matched by what it says
Last progress date not moved: an email is not progress (A-064).
The sender is a known Contact, so the system logs the email as an Activity on Alex Rowan’s Contact and, matched by what it says, on Church Farm (EML-C10, ACT-C29): it tops the Site’s activity with a mail icon, typed by no one. The last progress date does not move (A-064).
3System: the attachment is filed
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
GDV£13,420,000Approved appraisal
Land£3,640,000£130,000 per unit
Build£6,394,000+£74,000 since HoTs
Package£10,034,00074.8% of GDV
Fees£262,0002.6% of package
Stages
One record from Lead to Completed; each move is set by the event its module records
Construction Involved: Acceptable Build applies
Lead10 stages done
Instructed3 Aug
Acceptable Offer26 Aug
Acceptable Build14 Sep
Under Offer14 Sep
LegalsSince 5 Oct
ExchangedTarget 6 Nov
CompletedTarget 4 Dec
Activity
Logged from Outlook · nothing typed
Fri 6 Nov 2026
Email from Hadley & Finch LLP · Fri 6 NovEmail
Church Farm, Rugby (CE-014): exchange date agreed
On the Contact Alex Rowan and on Church Farm, matched by what it says
Draft transfer (TR1), Church Farm.pdfFiled to Contracts · from this emailCategory readHighlinkedUndo
Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).
Last progress date not moved: an email is not progress (A-064).
The AI recognises the category Contracts; Documents links the draft transfer into Church Farm’s SharePoint folder as linked, with the source email and the category, without displacing the latest approved contract (EML-C14, DOC-C10, D-034). The entry shows “Filed to Contracts · from this email”, the source-and-confidence chip and Undo (EML-C15).
4System: an update is proposed
A proposed update on Church Farm is waiting for you Valere CRM <notifications@valere.example> → Dana Whitfield <dana.whitfield@valere.example>
Valere CRMNotification
Proposed update
A proposed update is waiting
One change, read from an email. Nothing changes until you accept it.
CE-014Church Farm, Rugby
Legals
Target exchange
Fri 6 Nov → Fri 13 Nov 2026
Confidence
High
Source
Email from Alex Rowan, Hadley & Finch LLP, Fri 6 Nov 2026
Why
The date is stated in the email; completion stays Fri 4 Dec
Attached
Draft transfer (TR1), Church Farm.pdf · filed to Contracts
Valere CRM read an email from Hadley & Finch LLP and proposes one change to Church Farm, Rugby. Look at it beside the email, then accept or discard it.
Review the proposed updateOpen the source email
You received this because you own the Site. Nothing on it changes until you accept; the reading is the AI’s, and the source email is linked.
Notification settings·Open Valere CRM
Valere CRM · from the Valere notification mailbox, only to Valere staff
The email reports an agreed date, so the system proposes Target exchange date Fri 6 Nov 2026 → Fri 13 Nov 2026, source the email, confidence High (EML-C16). Dana Whitfield, owner of the field’s function, is the approver (EML-C17, D-033); ACT sends Dana Whitfield the proposedUpdate letter by the delivery Dana Whitfield chose (ACT-C18): nothing changes until Dana Whitfield accepts.
5Open the proposal on the web
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
GDV£13,420,000Approved appraisal
Land£3,640,000£130,000 per unit
Build£6,394,000+£74,000 since HoTs
Package£10,034,00074.8% of GDV
Fees£262,0002.6% of package
Stages
One record from Lead to Completed; each move is set by the event its module records
The owner of the field’s function approves. Nothing changes on the record before then (N-08, D-033).
Activity
Logged from Outlook · nothing typed
Fri 6 Nov 2026
Email from Hadley & Finch LLP · Fri 6 NovEmail
Church Farm, Rugby (CE-014): exchange date agreed
On the Contact Alex Rowan and on Church Farm, matched by what it says
Draft transfer (TR1), Church Farm.pdfFiled to Contracts · from this emailCategory readHighlinkedUndo
Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).
Last progress date not moved: an email is not progress (A-064).
Dana Whitfield clicked “Review the proposed update” in the letter; the decision is always made on the web (A-004). Church Farm opens on the proposal awaiting approval: current and proposed value, the source chip, Accept and Discard. The same item is on Dana Whitfield’s home page under Pending proposals (VIW-C51) and as a line on the stage bar.
6Read the source
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
GDV£13,420,000Approved appraisal
Land£3,640,000£130,000 per unit
Build£6,394,000+£74,000 since HoTs
Package£10,034,00074.8% of GDV
Fees£262,0002.6% of package
Stages
One record from Lead to Completed; each move is set by the event its module records
Dear Dana, All parties have now agreed a target exchange date of 13 November 2026 for Church Farm. Completion stays at 4 December.
The highlighted sentence is the passage the AI read.
Draft transfer (TR1), Church Farm.pdf
Proposed update
Awaiting approval
Target exchange dateFri 6 Nov 2026Fri 13 Nov 2026
Site
Church Farm, Rugby · CE-014
Source
Email from Alex Rowan, Fri 6 NovHigh
Approver
DW Dana Whitfield Partnerships
The owner of the field’s function approves. Nothing changes on the record before then (N-08, D-033).
Dana Whitfield clicks “Open the email” 1: the email opens beside the change, the sentence with the date highlighted as the passage the AI read. Dana Whitfield reads it and closes the panel 2.
7Accept
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
With Hadley & Finch LLP for 21 days · critical, 14 days late
Variance against Heads of Terms
HoTs signed 5 Oct
Item
Heads of Terms
Now
Change
Land price
£3,640,000
£3,640,000
No change
Build cost
£6,320,000
£6,394,000
+£74,000 (1.2%)
Package
£9,960,000
£10,034,000
+£74,000 (0.7%)
Valere fee
£262,000
£262,000
No change
Critical items
Land · Build · Scheme
Land
Land contract14 days late
Easement enquiry12 days open
Build
JCT amendments2 days late
ProposalsDue 11 Nov
Scheme
S106 variationBlocked: council
Condition 9Due 16 Nov
Fee controls
No fee flag up
Fee agreementSigned 3 Aug 2026
Triggered, not invoicedNone yet · agency at exchange
Exclusivity ends 23 NovExtension letter drafted
Legal progress
5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
Milestone
Held by
Days
Deadline
Status
Heads of Terms agreed
Valere
–
5 Oct
Closed
Land contract draftCritical path
Hadley & Finch LLP
21
26 Oct
In progress
Contractor’s ProposalsCritical path
Westbrook Construction
12
11 Nov
In progress
Board approval, first roundCritical path
Calder Valley Homes
4
12 Nov
Open
ExchangeCritical path
All parties
–
13 Nov
Open
Contracts out
3 with others · weekly chaser to the solicitor drafted today
Document
With
Since
Days
Status
Land contract
Hadley & Finch LLP
19 Oct
21
Draft awaited
Development agreement
Calder Valley Homes’ solicitors
2 Nov
7
Draft
JCT contract
Westbrook Construction
28 Oct
12
Draft
Accepted. The source email is linked to the change.Exchange · Fri 13 Nov 2026 · by Dana Whitfield, 10:05
Dana Whitfield clicked Accept. Legals writes the change with the email linked, the acceptance is audited with Dana Whitfield’s name and the proposal is final (EML-C17): Key dates show Exchange Fri 13 Nov 2026 with “from email of Fri 6 Nov”, the toast confirms, and the proposal leaves Pending proposals.
8System: an inbound site offer becomes a Candidate lead
Site for your consideration: Land at Hatch Farm, Sindlesham RG41 Gareth Pryce, Pryce & Lowe <gareth.pryce@pryceandlowe.example> → dana.whitfield@valere.example
Land at Hatch Farm, Sindlesham RG41Inbound emailGareth Pryce, 6 Nov32 unitsMixed tenureOutline · ApprovedSWNear match3 d
Former depot, Reading Road, WokinghamPlanning portal runWokingham BC · ref 262481 · captured 6 Nov18 units100% affordableFull · ApprovedSW3 d
Fenland Road Yard, PeterboroughPlanning portal runPeterborough CC · ref 25/01187 · captured 6 Nov26 unitsMixed tenureOutline · PendingCE3 d
A new candidate not reviewed in 30 days is rejected as “not reviewed”; the age is an Admin setting. Rejected and duplicate candidates can be returned to new with a reason.
Land at Hatch Farm, Sindlesham RG41
Near match: SW-031
ProvenanceEmail from Gareth Pryce, Fri 6 Nov · 2 attachments, filed on acceptance
Contact candidates· each keeps its lawful basis and Article 14 text
Edward MarshOwner · private: letter or phone onlyMatches a Contact
Gareth PryceAgentCreate a Contact
Gareth Pryce of Pryce & Lowe, on the admin’s agent domain list (D-038), emails Dana Whitfield a site. The system drafts a Candidate lead with source “inbound email” into the Review queue and files the attachments (EML-C18, LGN-C21, D-011): Provenance names the email, beside the near match to Hatch Farm, Sindlesham (SW-031). Dana Whitfield has nothing to approve; Back Office decides (flow 2).
9System: the Teams transcript is captured
Updated 12m agoJMCHRC
Morning Meeting
Monday 9 November · Monday: company, Interest and Offers · chair Rhys Calloway
Thresholds changed last week: the stall rule “no contact” now fires at 14 days, was 35 (Tom Ashworth, Wed 4 Nov).
SITE
STAGE
NEXT DEADLINE
NEXT ACTIONS BY FUNCTION
DEAL HEALTH
Heron Fields, ColchesterLE-022 · 46 units
Under Offer
Fri 6 Novoverdue 3 daysCarried over
PartnershipsChase the board date with Calder Valley Homes
ConstructionNot applicable
72Deal Health
Church Farm, RugbyCE-014 · 28 units
Legals
Mon 9 Novdue today
PartnershipsSend the offer review to the landowner
LegalChase Hadley & Finch LLP for the draft contract
55Deal HealthStalled · critical Legals task lateland contract draft 14 days late
Hatch Farm, SindleshamSW-031 · 33 units
Fee Discussion
Tue 10 Novin 1 day
LandConfirm the fee agreement is signed
ConstructionNot applicable
68Deal Health
Lea Bridge Works, WalthamstowLE-019 · 64 units
Acceptable Offer
Wed 11 Novin 2 days
ConstructionAgree the CSA with Westbrook Construction
41Deal HealthStalled · no contact 14 dthreshold 14 d · changed 4 Nov
Orchard Lane, WokinghamSW-027 · 52 units
Acceptable Offer
Thu 12 Novin 3 days
ConstructionReview the contractor price from Marlow & Pike Build
74Deal Health
Every row is a live slice of the Site records; nothing is typed here. Sites on hold or Parked are left out: Mill Pond, On Hold · Parked since 2 Nov. Deal Health weights are set by the Admin.
Notifications1 new
The Morning Meeting of Mon 9 Nov has proposals to review7 proposals and the minutes, drafted from the Teams transcript · 09:22Open the review
Also by email or in Teams, as chosen in Rhys Calloway’s notification settings.
The Morning Meeting of Mon 9 Nov 2026, recorded in Teams with Rhys Calloway as organiser, ends: its transcript is attached (EML-C22) and the AI drafts Site updates, new actions with owner, deadline and priority, and the minutes (EML-C23). Rhys Calloway is notified; the notification links to the review.
10Review the meeting on one screen
Updated 12m agoJMCHRC
Review the Morning Meeting
Mon 9 Nov 2026 · 08:30–09:15 · recorded in Teams · organiser and chair Rhys Calloway
Transcript attached
Nothing is written until you approve as chair; each item is then logged against the owner of the function it changes (N-08, D-033).
Capture from Teams depends on Valere’s Microsoft 365 permissions and transcript licences [?Q-026]; without a transcript, notes are added by hand.
Heron Fields, ColchesterLE-022 · Under Offer3
Weekly statusTranscript, 08:34Medium
At risk
Dana Whitfield · 08:34
Heron Fields: Calder Valley Homes say their board now sits on the twentieth. I’ll chase them for the paper by Wednesday.
What changedTranscript, 08:34High
RP board moved to 20 Nov; board paper being chased.
New actionTranscript, 08:34High
Chase Calder Valley Homes for the board paper
DWDana WhitfieldPartnershipsWed 11 Nov 2026Primary
Church Farm, RugbyCE-014 · Legals1
New actionTranscript, 08:41High
Get the JCT amendments back from Westbrook Construction
CHConor HigginsConstructionThu 12 Nov 2026Primary
editedProposed: due Wed 11 Nov 2026, kept as the source · edited by Rhys Calloway from the passage at 08:43
Discarded by Rhys Calloway: a chase is not progress
UnassignedNo Site matched “the Thatcham site”: place it on a Site or drop it
New actionTranscript, 09:03Low
Call the agent back about the Thatcham site
Minutes draft
Teams transcriptHigh
Heron Fields: RP board moved to 20 Nov; Dana chases the paper by Wed 11 Nov.
Church Farm: exchange 13 Nov; JCT amendments from Westbrook by Thu 12 Nov.
Lea Bridge Works: CSA a week later at Westbrook’s request.
Kingsmead: buyer’s solicitor still silent; chased.
Saved with the meeting when you approve.
Rhys Calloway opened the review with “Review proposals” on the Morning Meeting screen. Going down the list by Site, Rhys Calloway opens one transcript passage with “Show source” 1, moves the deadline of the JCT action to Thu 12 Nov 2026 2 (marked “edited”, the original kept as the source) and discards the Kingsmead progress date 3. The minutes draft is at the side.
11Approve the set
Updated 12m agoJMCHRC
Morning Meeting
Monday 9 November · Monday: company, Interest and Offers · chair Rhys Calloway
Approved by Rhys Calloway · Mon 9 Nov 2026, 09:482 actions created with owner, deadline and priority; weekly status and what changed written to the weekly review entries of Heron Fields and Lea Bridge Works; minutes saved. Dana Whitfield and Conor Higgins are notified.
Thresholds changed last week: the stall rule “no contact” now fires at 14 days, was 35 (Tom Ashworth, Wed 4 Nov).
SITE
STAGE
NEXT DEADLINE
NEXT ACTIONS BY FUNCTION
DEAL HEALTH
Heron Fields, ColchesterLE-022 · 46 units
Under Offer
Fri 6 Novoverdue 3 daysCarried over
PartnershipsChase the board date with Calder Valley Homes
PartnershipsChase Calder Valley Homes for the board paperNew
ConstructionNot applicable
72Deal Health
Church Farm, RugbyCE-014 · 28 units
Legals
Mon 9 Novdue today
PartnershipsSend the offer review to the landowner
LegalChase Hadley & Finch LLP for the draft contract
ConstructionGet the JCT amendments back from Westbrook ConstructionNew
55Deal HealthStalled · critical Legals task lateland contract draft 14 days late
Hatch Farm, SindleshamSW-031 · 33 units
Fee Discussion
Tue 10 Novin 1 day
LandConfirm the fee agreement is signed
ConstructionNot applicable
68Deal Health
Lea Bridge Works, WalthamstowLE-019 · 64 units
Acceptable Offer
Wed 11 Novin 2 days
ConstructionAgree the CSA with Westbrook Construction
41Deal HealthStalled · no contact 14 dthreshold 14 d · changed 4 Nov
Orchard Lane, WokinghamSW-027 · 52 units
Acceptable Offer
Thu 12 Novin 3 days
ConstructionReview the contractor price from Marlow & Pike Build
74Deal Health
Every row is a live slice of the Site records; nothing is typed here. Sites on hold or Parked are left out: Mill Pond, On Hold · Parked since 2 Nov. Deal Health weights are set by the Admin.
Rhys Calloway clicked “Approve all”. ACT creates the actions with owner, deadline and priority (ACT-C09); weekly status and what changed go to the weekly review entries (VIW-C12, VIW-C13), with no last progress date since the only one was discarded; the minutes are saved; each item is logged against the owner of its function (EML-C24, D-033). The board shows the new actions on their Sites under their function chips, and their owners are notified.
12Alternative: a proposed update discarded
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
GDV£13,420,000Approved appraisal
Land£3,640,000£130,000 per unit
Build£6,394,000+£74,000 since HoTs
Package£10,034,00074.8% of GDV
Fees£262,0002.6% of package
Stages
One record from Lead to Completed; each move is set by the event its module records
Construction Involved: Acceptable Build applies
Lead10 stages done
Instructed3 Aug
Acceptable Offer26 Aug
Acceptable Build14 Sep
Under Offer14 Sep
LegalsSince 5 Oct
ExchangedTarget 6 Nov
CompletedTarget 4 Dec
Proposed update
Discarded
Target exchange dateFri 6 Nov 2026Fri 13 Nov 2026
Site
Church Farm, Rugby · CE-014
Source
Email from Alex Rowan, Fri 6 NovHigh
Approver
DW Dana Whitfield Partnerships
Discarded by Dana Whitfield, Mon 9 Nov 2026. Nothing changed on Church Farm; only the audit entry remains. A decided proposal is final.
Activity
Logged from Outlook · nothing typed
Fri 6 Nov 2026
Email from Hadley & Finch LLP · Fri 6 NovEmail
Church Farm, Rugby (CE-014): exchange date agreed
On the Contact Alex Rowan and on Church Farm, matched by what it says
Draft transfer (TR1), Church Farm.pdfFiled to Contracts · from this emailCategory readHighlinkedUndo
Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).
Last progress date not moved: an email is not progress (A-064).
Alternative: at step 7 Dana Whitfield clicks Discard instead. Nothing changes on Church Farm and only the audit entry remains; the proposal leaves Pending proposals and the stage bar, and reopening it from the letter shows who discarded it and when: a decided proposal is final (D-033).
13Alternative: the record changed since the proposal
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
GDV£13,420,000Approved appraisal
Land£3,640,000£130,000 per unit
Build£6,394,000+£74,000 since HoTs
Package£10,034,00074.8% of GDV
Fees£262,0002.6% of package
Stages
One record from Lead to Completed; each move is set by the event its module records
The record changed since this was proposed — accept again
Target exchange dateNow on the record: edited after the proposalFri 13 Nov 2026
Site
Church Farm, Rugby · CE-014
Source
Email from Alex Rowan, Fri 6 NovHigh
Approver
DW Dana Whitfield Partnerships
The owner of the field’s function approves. Nothing changes on the record before then (N-08, D-033).
Activity
Logged from Outlook · nothing typed
Fri 6 Nov 2026
Email from Hadley & Finch LLP · Fri 6 NovEmail
Church Farm, Rugby (CE-014): exchange date agreed
On the Contact Alex Rowan and on Church Farm, matched by what it says
Draft transfer (TR1), Church Farm.pdfFiled to Contracts · from this emailCategory readHighlinkedUndo
Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).
Last progress date not moved: an email is not progress (A-064).
Alternative: someone edited the exchange date after the proposal was made. The proposal is shown against the current value with “The record changed since this was proposed — accept again”; Dana Whitfield accepts again 1 only if it still holds (EML-C17).
14Alternative: a newer email supersedes the proposal
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
GDV£13,420,000Approved appraisal
Land£3,640,000£130,000 per unit
Build£6,394,000+£74,000 since HoTs
Package£10,034,00074.8% of GDV
Fees£262,0002.6% of package
Stages
One record from Lead to Completed; each move is set by the event its module records
A proposal left past the admin’s limit, or on a Site that closes, lapses the same way (D-034).
Activity
Logged from Outlook · nothing typed
Fri 6 Nov 2026
Email from Hadley & Finch LLP · Fri 6 NovEmail
Church Farm, Rugby (CE-014): exchange date agreed
On the Contact Alex Rowan and on Church Farm, matched by what it says
Draft transfer (TR1), Church Farm.pdfFiled to Contracts · from this emailCategory readHighlinkedUndo
Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).
Last progress date not moved: an email is not progress (A-064).
Alternative: a later email in the same thread proposes another date. The first proposal moves to Superseded, greyed, with a link to the newer one; a proposal left too long, or on a closed Site, lapses (D-034).
15Alternative: an email not matched to a Site
Updated 12m agoJMCHRC
SL
Sarah Lomax
Head of Land, Central & East · Calder Valley Homes
Logged on the Contact only: the Contact is on more than one Site and the email does not say which. Nothing was filed or proposed.
Place on SitesOnly Sites you may see
Filing and proposals run again for each Site; the placing is audited (EML-C27).
Alternative: Sarah Lomax of Calder Valley Homes is on two Sites and the email does not say which, so it is logged on the Contact only (EML-C10, EML-C14). Dana Whitfield clicks “Place on Sites” 1, ticks Church Farm 2 in a picker of the Sites Dana Whitfield may see, and confirms 3: filing and proposals run again for that Site and the placing is audited (EML-C27).
16Alternative: an attachment filed wrongly, or not recognised
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
GDV£13,420,000Approved appraisal
Land£3,640,000£130,000 per unit
Build£6,394,000+£74,000 since HoTs
Package£10,034,00074.8% of GDV
Fees£262,0002.6% of package
Stages
One record from Lead to Completed; each move is set by the event its module records
Construction Involved: Acceptable Build applies
Lead10 stages done
Instructed3 Aug
Acceptable Offer26 Aug
Acceptable Build14 Sep
Under Offer14 Sep
LegalsSince 5 Oct
ExchangedTarget 13 Nov
CompletedTarget 4 Dec
Filing from this email
Each step is logged
Draft transfer (TR1), Church Farm.pdf · filed to Contracts by the AI, Fri 6 Nov
Filing undone by Dana Whitfield
Church Farm · CE-014
Choose a category
A file in a category the AI does not recognise, or over the admin’s size and page limit, is listed “to file by hand”, with a note that the AI did not read it (EML-C14).
Activity
Logged from Outlook · nothing typed
Fri 6 Nov 2026
Email from Hadley & Finch LLP · Fri 6 NovEmail
Church Farm, Rugby (CE-014): exchange date agreed
On the Contact Alex Rowan and on Church Farm, matched by what it says
Draft transfer (TR1), Church Farm.pdfFiling undone by Dana Whitfield
Last progress date not moved: an email is not progress (A-064).
Alternative: Dana Whitfield clicks Undo on the filing 1, then “File by hand” 2, and picks the Site 3 and the category 4 (DOC-C13, DOC-C16); the filing list logs both steps. An unrecognised category, or a file over the admin’s size and page limit, is shown “to file by hand” with a note that the AI did not read it (EML-C14).
17Alternative: a thread marked private
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
ExchangeTarget
4days left
13 NovMoved once
CompletionTarget
25days left
4 DecSet 5 Oct
LongstopHard date
39days left
18 DecIn the contract
HoTs to exchange
65days left
13 JanDay 35 of 100
Oldest outstanding
Land contract draft
With Hadley & Finch LLP for 21 days · critical, 14 days late
Variance against Heads of Terms
HoTs signed 5 Oct
Item
Heads of Terms
Now
Change
Land price
£3,640,000
£3,640,000
No change
Build cost
£6,320,000
£6,394,000
+£74,000 (1.2%)
Package
£9,960,000
£10,034,000
+£74,000 (0.7%)
Valere fee
£262,000
£262,000
No change
Critical items
Land · Build · Scheme
Land
Land contract14 days late
Easement enquiry12 days open
Build
JCT amendments2 days late
ProposalsDue 11 Nov
Scheme
S106 variationBlocked: council
Condition 9Due 16 Nov
Fee controls
No fee flag up
Fee agreementSigned 3 Aug 2026
Triggered, not invoicedNone yet · agency at exchange
Exclusivity ends 23 NovExtension letter drafted
Legal progress
5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
Milestone
Held by
Days
Deadline
Status
Heads of Terms agreed
Valere
–
5 Oct
Closed
Land contract draftCritical path
Hadley & Finch LLP
21
26 Oct
In progress
Contractor’s ProposalsCritical path
Westbrook Construction
12
11 Nov
In progress
Board approval, first roundCritical path
Calder Valley Homes
4
12 Nov
Open
ExchangeCritical path
All parties
–
13 Nov
Open
Contracts out
3 with others · weekly chaser to the solicitor drafted today
Document
With
Since
Days
Status
Land contract
Hadley & Finch LLP
19 Oct
21
Draft awaited
Development agreement
Calder Valley Homes’ solicitors
2 Nov
7
Draft
JCT contract
Westbrook Construction
28 Oct
12
Draft
Alternative: Dana Whitfield marks the thread private from the email view 1. A still-proposed update from it is discarded; the accepted exchange date stands with its source shown “redacted”; the filing, and any Candidate lead, stay with a redaction entry (EML-C11, D-033).
18Alternative: a first offer by email
Updated 12m agoJMCHRC
CE-014
Church Farm, Rugby
LegalsLand & BuildPriority: HighLegals is owned jointly byLandPartnershipsConstruction
LandownerThe Hale family
LandSBSophie Brennan
Partnerships PMDWDana Whitfield
ConstructionCHConor Higgins
Region · unitsCentral· 28
StatusActive
Construction InvolvedYes
Deal HealthFairProvisional formula
Recommended buyers
Scored out of 100 with the admin’s weights · threshold 50
Alternative: the email reports a first offer. Accepting the proposal opens Record offer on Site › Buyers, pre-filled with the figure and the source email (EML-C16, BUY-C14); Dana Whitfield checks it and records the offer 1.
19Alternative: a transcript item with no Site
Updated 12m agoJMCHRC
Review the Morning Meeting
Mon 9 Nov 2026 · 08:30–09:15 · recorded in Teams · organiser and chair Rhys Calloway
Transcript attached
Nothing is written until you approve as chair; each item is then logged against the owner of the function it changes (N-08, D-033).
Capture from Teams depends on Valere’s Microsoft 365 permissions and transcript licences [?Q-026]; without a transcript, notes are added by hand.
Heron Fields, ColchesterLE-022 · Under Offer3
Weekly statusTranscript, 08:34Medium
At risk
What changedTranscript, 08:34High
RP board moved to 20 Nov; board paper being chased.
New actionTranscript, 08:34High
Chase Calder Valley Homes for the board paper
DWDana WhitfieldPartnershipsWed 11 Nov 2026Primary
Church Farm, RugbyCE-014 · Legals1
New actionTranscript, 08:41High
Get the JCT amendments back from Westbrook Construction
CHConor HigginsConstructionThu 12 Nov 2026Primary
editedProposed: due Wed 11 Nov 2026, kept as the source · edited by Rhys Calloway from the passage at 08:43
Discarded by Rhys Calloway: a chase is not progress
UnassignedNo Site matched “the Thatcham site”: place it on a Site or drop it
New actionTranscript, 09:03Low
Call the agent back about the Thatcham site
Minutes draft
Teams transcriptHigh
Heron Fields: RP board moved to 20 Nov; Dana chases the paper by Wed 11 Nov.
Church Farm: exchange 13 Nov; JCT amendments from Westbrook by Thu 12 Nov.
Lea Bridge Works: CSA a week later at Westbrook’s request.
Kingsmead: buyer’s solicitor still silent; chased.
Saved with the meeting when you approve.
Alternative: the transcript names “the Thatcham site”, which matches no Site, so the item waits under Unassigned (EML-C23). Rhys Calloway places it on a Site 1 or drops it 2.
20Alternative: no transcript
Updated 12m agoJMCHRC
Review the Morning Meeting
Mon 9 Nov 2026 · 08:30–09:15 · not recorded · organiser and chair Rhys Calloway
Nothing is written until you approve as chair; each item is then logged against the owner of the function it changes (N-08, D-033).
Capture from Teams depends on Valere’s Microsoft 365 permissions and transcript licences [?Q-026]; without a transcript, notes are added by hand.
No transcript for this meeting
It was not recorded, or there is no transcript licence, so nothing was captured. Add the notes; the same proposals and approval follow.
Heron Fields: RP board moved to 20 Nov; Dana chases the paper by Wed 11 Nov.
Church Farm: exchange 13 Nov; JCT amendments from Westbrook by Thu 12 Nov.
Lea Bridge Works: CSA a week later at Westbrook’s request.
Kingsmead: buyer’s solicitor still silent; chased.
Alternative: the meeting was not recorded, or there is no transcript licence, so nothing is captured [?Q-026]. Rhys Calloway clicks “Add notes” 1 on the same review screen and types the notes 2; the same proposals and approval follow (EML-C22, EML-C25).
21Alternative: AI switched off
Updated 12m agoJMCHRC
Review the Morning Meeting
Mon 9 Nov 2026 · 08:30–09:15 · recorded in Teams · organiser and chair Rhys Calloway
Nothing is written until you approve as chair; each item is then logged against the owner of the function it changes (N-08, D-033).
Capture from Teams depends on Valere’s Microsoft 365 permissions and transcript licences [?Q-026]; without a transcript, notes are added by hand.
AI is turned offThe admin turned AI off (ADM-C30). Emails are still logged on their Contacts and Sites; no proposals, filings or minutes are drafted from this meeting.
Nothing proposed
Actions and weekly entries from this meeting are added by hand.
Alternative: Tom Ashworth, the Admin, turned AI off. Emails are still logged, no proposals or filings are made, and the review screen says so (EML-C16, EML-C23, ADM-C30).