Flows/An email or a meeting becomes a record update

Flows

An email or a meeting becomes a record update

A solicitor’s email becomes a proposed date change Dana accepts; an enquiry becomes a Candidate lead; a Teams transcript becomes actions the chair approves.

Actors
Dana Whitfield, Partnerships PM, owner of Church Farm; Rhys Calloway, Partner / MD, organiser and chair of the recorded Morning Meeting. The system captures, files and proposes; nothing changes until a named person accepts.
Starts at
An email from Hadley & Finch LLP about Church Farm, Rugby (CE-014) in Dana’s Outlook, Fri 6 Nov 2026.
Ends at
The agreed exchange date accepted on Church Farm with the email linked; an inbound site offer waiting in the Review queue; the Morning Meeting of Mon 9 Nov 2026 approved by its chair, its actions and weekly entries written.
Step 1 of 21 This screen is not drawn yet
  1. 1 An email arrives

    Church Farm, Rugby (CE-014): exchange date agreed
    Alex Rowan, Hadley & Finch LLP <alex.rowan@hadleyfinch.example> → dana.whitfield@valere.example
    Outlook · InboxFri 6 Nov 2026 · 15:20
    AR
    Alex Rowan · Hadley & Finch LLPalex.rowan@hadleyfinch.example

    Dear Dana,

    All parties have now agreed a target exchange date of 13 November 2026 for Church Farm. Completion stays at 4 December.

    I attach the draft transfer for your file; the land contract draft follows separately.

    Kind regards,

    Alex Rowan, Associate, Hadley & Finch LLP

    Draft transfer (TR1), Church Farm.pdfPDF

    In Outlook, Dana Whitfield opens the email from Alex Rowan of Hadley & Finch LLP on Church Farm: the target exchange date is agreed for Fri 13 Nov 2026, completion stays Fri 4 Dec, the draft transfer is attached. Dana Whitfield does nothing in the CRM.

  2. 2 System: the email is logged

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    GDV£13,420,000Approved appraisal
    Land£3,640,000£130,000 per unit
    Build£6,394,000+£74,000 since HoTs
    Package£10,034,00074.8% of GDV
    Fees£262,0002.6% of package

    Stages

    One record from Lead to Completed; each move is set by the event its module records
    Construction Involved: Acceptable Build applies
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. LegalsSince 5 Oct
    7. ExchangedTarget 6 Nov
    8. CompletedTarget 4 Dec

    Activity

    Logged from Outlook · nothing typed

    Fri 6 Nov 2026

    1. Email from Hadley & Finch LLP · Fri 6 NovEmail

      Church Farm, Rugby (CE-014): exchange date agreed

      On the Contact Alex Rowan and on Church Farm, matched by what it says

    Last progress date not moved: an email is not progress (A-064).

    The sender is a known Contact, so the system logs the email as an Activity on Alex Rowan’s Contact and, matched by what it says, on Church Farm (EML-C10, ACT-C29): it tops the Site’s activity with a mail icon, typed by no one. The last progress date does not move (A-064).

  3. 3 System: the attachment is filed

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    GDV£13,420,000Approved appraisal
    Land£3,640,000£130,000 per unit
    Build£6,394,000+£74,000 since HoTs
    Package£10,034,00074.8% of GDV
    Fees£262,0002.6% of package

    Stages

    One record from Lead to Completed; each move is set by the event its module records
    Construction Involved: Acceptable Build applies
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. LegalsSince 5 Oct
    7. ExchangedTarget 6 Nov
    8. CompletedTarget 4 Dec

    Activity

    Logged from Outlook · nothing typed

    Fri 6 Nov 2026

    1. Email from Hadley & Finch LLP · Fri 6 NovEmail

      Church Farm, Rugby (CE-014): exchange date agreed

      On the Contact Alex Rowan and on Church Farm, matched by what it says

      Draft transfer (TR1), Church Farm.pdf Filed to Contracts · from this emailCategory readHighlinkedUndo

      Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).

    Last progress date not moved: an email is not progress (A-064).

    The AI recognises the category Contracts; Documents links the draft transfer into Church Farm’s SharePoint folder as linked, with the source email and the category, without displacing the latest approved contract (EML-C14, DOC-C10, D-034). The entry shows “Filed to Contracts · from this email”, the source-and-confidence chip and Undo (EML-C15).

  4. 4 System: an update is proposed

    A proposed update on Church Farm is waiting for you
    Valere CRM <notifications@valere.example> → Dana Whitfield <dana.whitfield@valere.example>
    Valere CRMNotification
    Proposed update

    A proposed update is waiting

    One change, read from an email. Nothing changes until you accept it.

    CE-014Church Farm, Rugby
    Legals
    Target exchange
    Fri 6 Nov → Fri 13 Nov 2026
    Confidence
    High
    Source
    Email from Alex Rowan, Hadley & Finch LLP, Fri 6 Nov 2026
    Why
    The date is stated in the email; completion stays Fri 4 Dec
    Attached
    Draft transfer (TR1), Church Farm.pdf · filed to Contracts

    Valere CRM read an email from Hadley & Finch LLP and proposes one change to Church Farm, Rugby. Look at it beside the email, then accept or discard it.

    Review the proposed updateOpen the source email

    You received this because you own the Site. Nothing on it changes until you accept; the reading is the AI’s, and the source email is linked.

    Valere CRM · from the Valere notification mailbox, only to Valere staff

    The email reports an agreed date, so the system proposes Target exchange date Fri 6 Nov 2026 → Fri 13 Nov 2026, source the email, confidence High (EML-C16). Dana Whitfield, owner of the field’s function, is the approver (EML-C17, D-033); ACT sends Dana Whitfield the proposedUpdate letter by the delivery Dana Whitfield chose (ACT-C18): nothing changes until Dana Whitfield accepts.

  5. 5 Open the proposal on the web

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    GDV£13,420,000Approved appraisal
    Land£3,640,000£130,000 per unit
    Build£6,394,000+£74,000 since HoTs
    Package£10,034,00074.8% of GDV
    Fees£262,0002.6% of package

    Stages

    One record from Lead to Completed; each move is set by the event its module records
    1 proposed update · Target exchange dateConstruction Involved: Acceptable Build applies
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. LegalsSince 5 Oct
    7. ExchangedTarget 6 Nov
    8. CompletedTarget 4 Dec

    Proposed update

    Awaiting approval
    Target exchange date Fri 6 Nov 2026Fri 13 Nov 2026
    Site
    Church Farm, Rugby · CE-014
    Source
    Email from Alex Rowan, Fri 6 NovHigh
    Approver
    DW Dana Whitfield Partnerships

    The owner of the field’s function approves. Nothing changes on the record before then (N-08, D-033).

    Activity

    Logged from Outlook · nothing typed

    Fri 6 Nov 2026

    1. Email from Hadley & Finch LLP · Fri 6 NovEmail

      Church Farm, Rugby (CE-014): exchange date agreed

      On the Contact Alex Rowan and on Church Farm, matched by what it says

      Draft transfer (TR1), Church Farm.pdf Filed to Contracts · from this emailCategory readHighlinkedUndo

      Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).

    Last progress date not moved: an email is not progress (A-064).

    Dana Whitfield clicked “Review the proposed update” in the letter; the decision is always made on the web (A-004). Church Farm opens on the proposal awaiting approval: current and proposed value, the source chip, Accept and Discard. The same item is on Dana Whitfield’s home page under Pending proposals (VIW-C51) and as a line on the stage bar.

  6. 6 Read the source

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    GDV£13,420,000Approved appraisal
    Land£3,640,000£130,000 per unit
    Build£6,394,000+£74,000 since HoTs
    Package£10,034,00074.8% of GDV
    Fees£262,0002.6% of package

    Stages

    One record from Lead to Completed; each move is set by the event its module records
    1 proposed update · Target exchange dateConstruction Involved: Acceptable Build applies
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. LegalsSince 5 Oct
    7. ExchangedTarget 6 Nov
    8. CompletedTarget 4 Dec

    Proposed update

    Awaiting approval
    Target exchange date Fri 6 Nov 2026Fri 13 Nov 2026
    Site
    Church Farm, Rugby · CE-014
    Source
    Email from Alex Rowan, Fri 6 NovHigh
    Approver
    DW Dana Whitfield Partnerships

    The owner of the field’s function approves. Nothing changes on the record before then (N-08, D-033).

    Dana Whitfield clicks “Open the email” 1: the email opens beside the change, the sentence with the date highlighted as the passage the AI read. Dana Whitfield reads it and closes the panel 2.

  7. 7 Accept

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    ExchangeTarget
    4days left
    CompletionTarget
    25days left
    4 DecSet 5 Oct
    LongstopHard date
    39days left
    18 DecIn the contract
    HoTs to exchange
    65days left
    13 JanDay 35 of 100
    Oldest outstanding

    Land contract draft

    With Hadley & Finch LLP for 21 days · critical, 14 days late

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2126 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1211 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes412 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft
    Accepted. The source email is linked to the change.Exchange · Fri 13 Nov 2026 · by Dana Whitfield, 10:05

    Dana Whitfield clicked Accept. Legals writes the change with the email linked, the acceptance is audited with Dana Whitfield’s name and the proposal is final (EML-C17): Key dates show Exchange Fri 13 Nov 2026 with “from email of Fri 6 Nov”, the toast confirms, and the proposal leaves Pending proposals.

  8. 8 System: an inbound site offer becomes a Candidate lead

    Site for your consideration: Land at Hatch Farm, Sindlesham RG41
    Gareth Pryce, Pryce & Lowe <gareth.pryce@pryceandlowe.example> → dana.whitfield@valere.example
    Outlook · InboxFri 6 Nov 2026 · 16:42
    GP
    Gareth Pryce · Pryce & Lowegareth.pryce@pryceandlowe.example

    Dana,

    We act for a client with land at Hatch Farm, Sindlesham: about 32 homes, mixed tenure, with outline consent. Plan and particulars attached.

    Happy to arrange a visit.

    Gareth Pryce, Pryce & Lowe

    Site plan, Hatch Farm.pdfPDFParticulars, Land at Hatch Farm.pdfPDF
    Drafted into the Review queue for Back Office
    Updated 12m agoJMCHRC

    Review queue

    Candidate leads from collection runs and inbound email; nothing becomes a Lead until Back Office accepts it

    Last run finished today, 06:10
    Source healthWokingham BC06:10Peterborough CC06:05Reading BCfailing since 6 Nov · Admin alertedInbound emaillisted domains
    New3Rejected41Duplicate6SourceAllTypeAllRegionAllPlanning statusAllAgeAny
    2 selected
    • Land at Hatch Farm, Sindlesham RG41 Inbound emailGareth Pryce, 6 Nov32 unitsMixed tenureOutline · ApprovedSW Near match3 d
    • Former depot, Reading Road, Wokingham Planning portal runWokingham BC · ref 262481 · captured 6 Nov18 units100% affordableFull · ApprovedSW3 d
    • Fenland Road Yard, Peterborough Planning portal runPeterborough CC · ref 25/01187 · captured 6 Nov26 unitsMixed tenureOutline · PendingCE3 d

    A new candidate not reviewed in 30 days is rejected as “not reviewed”; the age is an Admin setting. Rejected and duplicate candidates can be returned to new with a reason.

    Land at Hatch Farm, Sindlesham RG41

    Near match: SW-031
    ProvenanceEmail from Gareth Pryce, Fri 6 Nov · 2 attachments, filed on acceptance
    Open the email
    Suggested32 unitsHighMixed tenureMedium
    This candidateSW-031 · Hatch Farm
    AddressMill Road, SindleshamHatch Farm, Sindlesham
    Referencenone in the emailWokingham BC 262113
    Units3233, the team’s edit stays
    StageCandidate · newFee Discussion
    Contact candidates · each keeps its lawful basis and Article 14 text
    • Edward MarshOwner · private: letter or phone only Matches a Contact
    • Gareth PryceAgentCreate a Contact
    Same site?

    Gareth Pryce of Pryce & Lowe, on the admin’s agent domain list (D-038), emails Dana Whitfield a site. The system drafts a Candidate lead with source “inbound email” into the Review queue and files the attachments (EML-C18, LGN-C21, D-011): Provenance names the email, beside the near match to Hatch Farm, Sindlesham (SW-031). Dana Whitfield has nothing to approve; Back Office decides (flow 2).

  9. 9 System: the Teams transcript is captured

    Updated 12m agoJMCHRC

    Morning Meeting

    Monday 9 November · Monday: company, Interest and Offers · chair Rhys Calloway

    Overdue1Heron Fields, 3 days
    Due this week4Church Farm, Hatch Farm and 2 more
    On track0Nothing later in Primary

    Thresholds changed last week: the stall rule “no contact” now fires at 14 days, was 35 (Tom Ashworth, Wed 4 Nov).

    SITESTAGENEXT DEADLINENEXT ACTIONS BY FUNCTIONDEAL HEALTH
    Heron Fields, ColchesterLE-022 · 46 unitsUnder Offer Fri 6 Novoverdue 3 days Carried over
    • PartnershipsChase the board date with Calder Valley Homes
    • ConstructionNot applicable
    72Deal Health
    Church Farm, RugbyCE-014 · 28 unitsLegals Mon 9 Novdue today
    • PartnershipsSend the offer review to the landowner
    • LegalChase Hadley & Finch LLP for the draft contract
    55Deal HealthStalled · critical Legals task lateland contract draft 14 days late
    Hatch Farm, SindleshamSW-031 · 33 unitsFee Discussion Tue 10 Novin 1 day
    • LandConfirm the fee agreement is signed
    • ConstructionNot applicable
    68Deal Health
    Lea Bridge Works, WalthamstowLE-019 · 64 unitsAcceptable Offer Wed 11 Novin 2 days
    • ConstructionAgree the CSA with Westbrook Construction
    41Deal HealthStalled · no contact 14 dthreshold 14 d · changed 4 Nov
    Orchard Lane, WokinghamSW-027 · 52 unitsAcceptable Offer Thu 12 Novin 3 days
    • ConstructionReview the contractor price from Marlow & Pike Build
    74Deal Health

    Every row is a live slice of the Site records; nothing is typed here. Sites on hold or Parked are left out: Mill Pond, On Hold · Parked since 2 Nov. Deal Health weights are set by the Admin.

    The Morning Meeting of Mon 9 Nov 2026, recorded in Teams with Rhys Calloway as organiser, ends: its transcript is attached (EML-C22) and the AI drafts Site updates, new actions with owner, deadline and priority, and the minutes (EML-C23). Rhys Calloway is notified; the notification links to the review.

  10. 10 Review the meeting on one screen

    Updated 12m agoJMCHRC

    Review the Morning Meeting

    Mon 9 Nov 2026 · 08:30–09:15 · recorded in Teams · organiser and chair Rhys Calloway

    Transcript attached

    Nothing is written until you approve as chair; each item is then logged against the owner of the function it changes (N-08, D-033).

    Capture from Teams depends on Valere’s Microsoft 365 permissions and transcript licences [?Q-026]; without a transcript, notes are added by hand.

    Heron Fields, ColchesterLE-022 · Under Offer3
    • Weekly statusTranscript, 08:34Medium

      At risk

      Dana Whitfield · 08:34

      Heron Fields: Calder Valley Homes say their board now sits on the twentieth. I’ll chase them for the paper by Wednesday.

    • What changedTranscript, 08:34High

      RP board moved to 20 Nov; board paper being chased.

    • New actionTranscript, 08:34High

      Chase Calder Valley Homes for the board paper

      DWDana WhitfieldPartnerships Wed 11 Nov 2026 Primary
    Church Farm, RugbyCE-014 · Legals1
    • New actionTranscript, 08:41High

      Get the JCT amendments back from Westbrook Construction

      CHConor HigginsConstruction Thu 12 Nov 2026 Primary

      editedProposed: due Wed 11 Nov 2026, kept as the source · edited by Rhys Calloway from the passage at 08:43

    Lea Bridge Works, WalthamstowLE-019 · Acceptable Offer1
    • What changedTranscript, 08:43High

      Westbrook asked for one more week on the CSA.

    Kingsmead, BasingstokeSW-024 · Legals1
    • Last progress dateTranscript, 08:52LowDiscarded

      Mon 9 Nov 2026

      Discarded by Rhys Calloway: a chase is not progress

    UnassignedNo Site matched “the Thatcham site”: place it on a Site or drop it
    • New actionTranscript, 09:03Low

      Call the agent back about the Thatcham site

    Minutes draft

    Teams transcriptHigh
    • Heron Fields: RP board moved to 20 Nov; Dana chases the paper by Wed 11 Nov.
    • Church Farm: exchange 13 Nov; JCT amendments from Westbrook by Thu 12 Nov.
    • Lea Bridge Works: CSA a week later at Westbrook’s request.
    • Kingsmead: buyer’s solicitor still silent; chased.

    Saved with the meeting when you approve.

    Rhys Calloway opened the review with “Review proposals” on the Morning Meeting screen. Going down the list by Site, Rhys Calloway opens one transcript passage with “Show source” 1, moves the deadline of the JCT action to Thu 12 Nov 2026 2 (marked “edited”, the original kept as the source) and discards the Kingsmead progress date 3. The minutes draft is at the side.

  11. 11 Approve the set

    Updated 12m agoJMCHRC

    Morning Meeting

    Monday 9 November · Monday: company, Interest and Offers · chair Rhys Calloway

    Approved by Rhys Calloway · Mon 9 Nov 2026, 09:482 actions created with owner, deadline and priority; weekly status and what changed written to the weekly review entries of Heron Fields and Lea Bridge Works; minutes saved. Dana Whitfield and Conor Higgins are notified.
    Overdue1Heron Fields, 3 days
    Due this week4Church Farm, Hatch Farm and 2 more
    On track0Nothing later in Primary

    Thresholds changed last week: the stall rule “no contact” now fires at 14 days, was 35 (Tom Ashworth, Wed 4 Nov).

    SITESTAGENEXT DEADLINENEXT ACTIONS BY FUNCTIONDEAL HEALTH
    Heron Fields, ColchesterLE-022 · 46 unitsUnder Offer Fri 6 Novoverdue 3 days Carried over
    • PartnershipsChase the board date with Calder Valley Homes
    • PartnershipsChase Calder Valley Homes for the board paperNew
    • ConstructionNot applicable
    72Deal Health
    Church Farm, RugbyCE-014 · 28 unitsLegals Mon 9 Novdue today
    • PartnershipsSend the offer review to the landowner
    • LegalChase Hadley & Finch LLP for the draft contract
    • ConstructionGet the JCT amendments back from Westbrook ConstructionNew
    55Deal HealthStalled · critical Legals task lateland contract draft 14 days late
    Hatch Farm, SindleshamSW-031 · 33 unitsFee Discussion Tue 10 Novin 1 day
    • LandConfirm the fee agreement is signed
    • ConstructionNot applicable
    68Deal Health
    Lea Bridge Works, WalthamstowLE-019 · 64 unitsAcceptable Offer Wed 11 Novin 2 days
    • ConstructionAgree the CSA with Westbrook Construction
    41Deal HealthStalled · no contact 14 dthreshold 14 d · changed 4 Nov
    Orchard Lane, WokinghamSW-027 · 52 unitsAcceptable Offer Thu 12 Novin 3 days
    • ConstructionReview the contractor price from Marlow & Pike Build
    74Deal Health

    Every row is a live slice of the Site records; nothing is typed here. Sites on hold or Parked are left out: Mill Pond, On Hold · Parked since 2 Nov. Deal Health weights are set by the Admin.

    Rhys Calloway clicked “Approve all”. ACT creates the actions with owner, deadline and priority (ACT-C09); weekly status and what changed go to the weekly review entries (VIW-C12, VIW-C13), with no last progress date since the only one was discarded; the minutes are saved; each item is logged against the owner of its function (EML-C24, D-033). The board shows the new actions on their Sites under their function chips, and their owners are notified.

  12. 12 Alternative: a proposed update discarded

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    GDV£13,420,000Approved appraisal
    Land£3,640,000£130,000 per unit
    Build£6,394,000+£74,000 since HoTs
    Package£10,034,00074.8% of GDV
    Fees£262,0002.6% of package

    Stages

    One record from Lead to Completed; each move is set by the event its module records
    Construction Involved: Acceptable Build applies
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. LegalsSince 5 Oct
    7. ExchangedTarget 6 Nov
    8. CompletedTarget 4 Dec

    Proposed update

    Discarded
    Target exchange date Fri 6 Nov 2026Fri 13 Nov 2026
    Site
    Church Farm, Rugby · CE-014
    Source
    Email from Alex Rowan, Fri 6 NovHigh
    Approver
    DW Dana Whitfield Partnerships

    Discarded by Dana Whitfield, Mon 9 Nov 2026. Nothing changed on Church Farm; only the audit entry remains. A decided proposal is final.

    Activity

    Logged from Outlook · nothing typed

    Fri 6 Nov 2026

    1. Email from Hadley & Finch LLP · Fri 6 NovEmail

      Church Farm, Rugby (CE-014): exchange date agreed

      On the Contact Alex Rowan and on Church Farm, matched by what it says

      Draft transfer (TR1), Church Farm.pdf Filed to Contracts · from this emailCategory readHighlinkedUndo

      Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).

    Last progress date not moved: an email is not progress (A-064).

    Alternative: at step 7 Dana Whitfield clicks Discard instead. Nothing changes on Church Farm and only the audit entry remains; the proposal leaves Pending proposals and the stage bar, and reopening it from the letter shows who discarded it and when: a decided proposal is final (D-033).

  13. 13 Alternative: the record changed since the proposal

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    GDV£13,420,000Approved appraisal
    Land£3,640,000£130,000 per unit
    Build£6,394,000+£74,000 since HoTs
    Package£10,034,00074.8% of GDV
    Fees£262,0002.6% of package

    Stages

    One record from Lead to Completed; each move is set by the event its module records
    1 proposed update · Target exchange dateConstruction Involved: Acceptable Build applies
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. LegalsSince 5 Oct
    7. ExchangedTarget 6 Nov
    8. CompletedTarget 4 Dec

    Proposed update

    Awaiting approval
    The record changed since this was proposed — accept again
    Target exchange date Now on the record: edited after the proposalFri 13 Nov 2026
    Site
    Church Farm, Rugby · CE-014
    Source
    Email from Alex Rowan, Fri 6 NovHigh
    Approver
    DW Dana Whitfield Partnerships

    The owner of the field’s function approves. Nothing changes on the record before then (N-08, D-033).

    Activity

    Logged from Outlook · nothing typed

    Fri 6 Nov 2026

    1. Email from Hadley & Finch LLP · Fri 6 NovEmail

      Church Farm, Rugby (CE-014): exchange date agreed

      On the Contact Alex Rowan and on Church Farm, matched by what it says

      Draft transfer (TR1), Church Farm.pdf Filed to Contracts · from this emailCategory readHighlinkedUndo

      Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).

    Last progress date not moved: an email is not progress (A-064).

    Alternative: someone edited the exchange date after the proposal was made. The proposal is shown against the current value with “The record changed since this was proposed — accept again”; Dana Whitfield accepts again 1 only if it still holds (EML-C17).

  14. 14 Alternative: a newer email supersedes the proposal

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    GDV£13,420,000Approved appraisal
    Land£3,640,000£130,000 per unit
    Build£6,394,000+£74,000 since HoTs
    Package£10,034,00074.8% of GDV
    Fees£262,0002.6% of package

    Stages

    One record from Lead to Completed; each move is set by the event its module records
    Construction Involved: Acceptable Build applies
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. LegalsSince 5 Oct
    7. ExchangedTarget 6 Nov
    8. CompletedTarget 4 Dec

    Proposed update

    Superseded
    Target exchange date Fri 6 Nov 2026Fri 13 Nov 2026
    Site
    Church Farm, Rugby · CE-014
    Source
    Email from Alex Rowan, Fri 6 NovHigh
    Approver
    DW Dana Whitfield Partnerships

    Superseded by a later email in the same thread. Open the newer proposal

    A proposal left past the admin’s limit, or on a Site that closes, lapses the same way (D-034).

    Activity

    Logged from Outlook · nothing typed

    Fri 6 Nov 2026

    1. Email from Hadley & Finch LLP · Fri 6 NovEmail

      Church Farm, Rugby (CE-014): exchange date agreed

      On the Contact Alex Rowan and on Church Farm, matched by what it says

      Draft transfer (TR1), Church Farm.pdf Filed to Contracts · from this emailCategory readHighlinkedUndo

      Linked into Church Farm’s SharePoint folder with the source email and the category; the latest approved contract stays the latest (D-034).

    Last progress date not moved: an email is not progress (A-064).

    Alternative: a later email in the same thread proposes another date. The first proposal moves to Superseded, greyed, with a link to the newer one; a proposal left too long, or on a closed Site, lapses (D-034).

  15. 15 Alternative: an email not matched to a Site

    Updated 12m agoJMCHRC
    SL

    Sarah Lomax

    Head of Land, Central & East · Calder Valley Homes

    Key Contact onChurch Farm · CE-014Heron Fields · LE-022

    Activity

    1. Email from Sarah Lomax, Calder Valley HomesEmail

      Logged on the Contact only: the Contact is on more than one Site and the email does not say which. Nothing was filed or proposed.

    Alternative: Sarah Lomax of Calder Valley Homes is on two Sites and the email does not say which, so it is logged on the Contact only (EML-C10, EML-C14). Dana Whitfield clicks “Place on Sites” 1, ticks Church Farm 2 in a picker of the Sites Dana Whitfield may see, and confirms 3: filing and proposals run again for that Site and the placing is audited (EML-C27).

  16. 16 Alternative: an attachment filed wrongly, or not recognised

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    GDV£13,420,000Approved appraisal
    Land£3,640,000£130,000 per unit
    Build£6,394,000+£74,000 since HoTs
    Package£10,034,00074.8% of GDV
    Fees£262,0002.6% of package

    Stages

    One record from Lead to Completed; each move is set by the event its module records
    Construction Involved: Acceptable Build applies
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. LegalsSince 5 Oct
    7. ExchangedTarget 13 Nov
    8. CompletedTarget 4 Dec

    Filing from this email

    Each step is logged
    • Draft transfer (TR1), Church Farm.pdf · filed to Contracts by the AI, Fri 6 Nov
    • Filing undone by Dana Whitfield
    Church Farm · CE-014
    Choose a category
    A file in a category the AI does not recognise, or over the admin’s size and page limit, is listed “to file by hand”, with a note that the AI did not read it (EML-C14).

    Activity

    Logged from Outlook · nothing typed

    Fri 6 Nov 2026

    1. Email from Hadley & Finch LLP · Fri 6 NovEmail

      Church Farm, Rugby (CE-014): exchange date agreed

      On the Contact Alex Rowan and on Church Farm, matched by what it says

      Draft transfer (TR1), Church Farm.pdf Filing undone by Dana Whitfield

    Last progress date not moved: an email is not progress (A-064).

    Alternative: Dana Whitfield clicks Undo on the filing 1, then “File by hand” 2, and picks the Site 3 and the category 4 (DOC-C13, DOC-C16); the filing list logs both steps. An unrecognised category, or a file over the admin’s size and page limit, is shown “to file by hand” with a note that the AI did not read it (EML-C14).

  17. 17 Alternative: a thread marked private

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    ExchangeTarget
    4days left
    13 NovMoved once
    CompletionTarget
    25days left
    4 DecSet 5 Oct
    LongstopHard date
    39days left
    18 DecIn the contract
    HoTs to exchange
    65days left
    13 JanDay 35 of 100
    Oldest outstanding

    Land contract draft

    With Hadley & Finch LLP for 21 days · critical, 14 days late

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2126 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1211 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes412 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft

    Alternative: Dana Whitfield marks the thread private from the email view 1. A still-proposed update from it is discarded; the accepted exchange date stands with its source shown “redacted”; the filing, and any Candidate lead, stay with a redaction entry (EML-C11, D-033).

  18. 18 Alternative: a first offer by email

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula

    Recommended buyers

    Scored out of 100 with the admin’s weights · threshold 50
    82Strong

    Fenwick Housing GroupRP · updated 14 Oct

    Active in Central; 28 homes in their 20 to 60 range.

    RegionUnitsS106Turnkey
    68Fair

    Brackley Community HomesRP · updated 2 Sep

    Scored on 3 of 4 criteria: turnkey not on the Account.

    RegionUnitsS106Turnkey
    3 buyers already in the journey are hidden · 4 scoring under 50 are not shown

    Coverage

    Target 15 · an RP counts from Pitched
    10of 15 RPs reachedUnder-pitched · 5 short
    • Coverage1
    • Teaser1
    • Pitched3
    • Interested2
    • Offered3
    • Agreed1
    • Board0
    • Approved0
    • Not Interested3

    Buyer journey

    Fee agreement recorded 3 Aug 2026buyers may move past Coverage; no held moves to replay
    Buyer · contactStageOfferLand valuePer unit% of GDVValere feeGradeNext step
    RPs · 11current offer version first · Calder Valley Homes’s unique offer was £9,800,000 · 8 more: 2 Offered, 1 Interested, 2 Pitched, 1 Teaser, 2 Not Interested
    Calder Valley HomesSarah Lomax · Preferred RPAgreed£9,960,000£3,640,000£355,71474.2%£262,000GoodBoard date 12 Nov
    Ashby Rural HousingMark FeeneyOffered£9,730,000£3,410,000£347,50072.5%£256,000AcceptableKept as back-up
    Northfield PartnershipHelen PriceNot Interested£9,450,000£3,130,000£337,50070.4%£249,000WeakReason: price too low
    Private buyers · 3No coverage target · 1 more at Coverage
    Tamar HomesBTR · Owen PryceInterested––––––Site visit 12 Nov
    Oakhurst LivingBTR · Rachel DunnPitched––––––Awaiting feedback

    Alternative: the email reports a first offer. Accepting the proposal opens Record offer on Site › Buyers, pre-filled with the figure and the source email (EML-C16, BUY-C14); Dana Whitfield checks it and records the offer 1.

  19. 19 Alternative: a transcript item with no Site

    Updated 12m agoJMCHRC

    Review the Morning Meeting

    Mon 9 Nov 2026 · 08:30–09:15 · recorded in Teams · organiser and chair Rhys Calloway

    Transcript attached

    Nothing is written until you approve as chair; each item is then logged against the owner of the function it changes (N-08, D-033).

    Capture from Teams depends on Valere’s Microsoft 365 permissions and transcript licences [?Q-026]; without a transcript, notes are added by hand.

    Heron Fields, ColchesterLE-022 · Under Offer3
    • Weekly statusTranscript, 08:34Medium

      At risk

    • What changedTranscript, 08:34High

      RP board moved to 20 Nov; board paper being chased.

    • New actionTranscript, 08:34High

      Chase Calder Valley Homes for the board paper

      DWDana WhitfieldPartnerships Wed 11 Nov 2026 Primary
    Church Farm, RugbyCE-014 · Legals1
    • New actionTranscript, 08:41High

      Get the JCT amendments back from Westbrook Construction

      CHConor HigginsConstruction Thu 12 Nov 2026 Primary

      editedProposed: due Wed 11 Nov 2026, kept as the source · edited by Rhys Calloway from the passage at 08:43

    Lea Bridge Works, WalthamstowLE-019 · Acceptable Offer1
    • What changedTranscript, 08:43High

      Westbrook asked for one more week on the CSA.

    Kingsmead, BasingstokeSW-024 · Legals1
    • Last progress dateTranscript, 08:52LowDiscarded

      Mon 9 Nov 2026

      Discarded by Rhys Calloway: a chase is not progress

    UnassignedNo Site matched “the Thatcham site”: place it on a Site or drop it
    • New actionTranscript, 09:03Low

      Call the agent back about the Thatcham site

    Minutes draft

    Teams transcriptHigh
    • Heron Fields: RP board moved to 20 Nov; Dana chases the paper by Wed 11 Nov.
    • Church Farm: exchange 13 Nov; JCT amendments from Westbrook by Thu 12 Nov.
    • Lea Bridge Works: CSA a week later at Westbrook’s request.
    • Kingsmead: buyer’s solicitor still silent; chased.

    Saved with the meeting when you approve.

    Alternative: the transcript names “the Thatcham site”, which matches no Site, so the item waits under Unassigned (EML-C23). Rhys Calloway places it on a Site 1 or drops it 2.

  20. 20 Alternative: no transcript

    Updated 12m agoJMCHRC

    Review the Morning Meeting

    Mon 9 Nov 2026 · 08:30–09:15 · not recorded · organiser and chair Rhys Calloway

    Nothing is written until you approve as chair; each item is then logged against the owner of the function it changes (N-08, D-033).

    Capture from Teams depends on Valere’s Microsoft 365 permissions and transcript licences [?Q-026]; without a transcript, notes are added by hand.

    No transcript for this meeting

    It was not recorded, or there is no transcript licence, so nothing was captured. Add the notes; the same proposals and approval follow.

    Heron Fields: RP board moved to 20 Nov; Dana chases the paper by Wed 11 Nov.

    Church Farm: exchange 13 Nov; JCT amendments from Westbrook by Thu 12 Nov.

    Lea Bridge Works: CSA a week later at Westbrook’s request.

    Kingsmead: buyer’s solicitor still silent; chased.

    Alternative: the meeting was not recorded, or there is no transcript licence, so nothing is captured [?Q-026]. Rhys Calloway clicks “Add notes” 1 on the same review screen and types the notes 2; the same proposals and approval follow (EML-C22, EML-C25).

  21. 21 Alternative: AI switched off

    Updated 12m agoJMCHRC

    Review the Morning Meeting

    Mon 9 Nov 2026 · 08:30–09:15 · recorded in Teams · organiser and chair Rhys Calloway

    Nothing is written until you approve as chair; each item is then logged against the owner of the function it changes (N-08, D-033).

    Capture from Teams depends on Valere’s Microsoft 365 permissions and transcript licences [?Q-026]; without a transcript, notes are added by hand.

    AI is turned offThe admin turned AI off (ADM-C30). Emails are still logged on their Contacts and Sites; no proposals, filings or minutes are drafted from this meeting.
    Nothing proposed

    Actions and weekly entries from this meeting are added by hand.

    Alternative: Tom Ashworth, the Admin, turned AI off. Emails are still logged, no proposals or filings are made, and the review screen says so (EML-C16, EML-C23, ADM-C30).